Optimal scheduling of the next preventive maintenance activity for a wind farm
نویسندگان
چکیده
Abstract. A large part of the operational cost for a wind farm is due to equipment maintenance, especially offshore farms. How reduce maintenance cost, and hence increase profitability, this article's focus. It presents binary linear optimization model whose solution may inform turbine owners about which components, when, should undergo next preventive (PM) replacements. The suggested short-term scheduling strategy takes into account eventual failure events multi-component system – in that after failed repaired, previously scheduled PM plan be updated, assuming restored components are as good new. algorithm paper, NextPM, tested through numerical case studies applied four-component turbine. first study addresses important single component system, used parameter calibration purposes. second analyses seasonal variations mobilization costs, compared constant setting. Among other things, analysis reveals 35 % reduction achieved by NextPM model, pure corrective (CM) strategy. third compares with another problem interval costs (PMSPIC), was major source inspiration article. This comparison demonstrates accurate much faster terms computational time.
منابع مشابه
A system for the detailed scheduling of wind farm maintenance
As the share of wind energy increases on the global energy market, the efficient operation of wind farms gains an ever growing significance. Among operational decisions, the planning and scheduling of maintenance operations are crucial for the availability of turbines, as well as for the operational costs. The paper introduces a system that performs the detailed scheduling of maintenance operat...
متن کاملWind farm maintenance scheduling model and solution approach
Wind energy has become an important source of energy in the last years, proven to be an alternative to fossil power production. The advances in technology have allowed to exploit this resource in new environments. While offshore wind farms projects are growing at important rates, onshore farms are still the main contributors of this energy source. However, challenges to make wind farms projects...
متن کاملA model for the preventive maintenance scheduling of power plants including wind farms
This paper considers the problem of Power Plant Preventive Maintenance Scheduling (PPPMS). The goal is to evaluate which generators must stop production to be checked periodically for safety reasons. Preventive maintenance is crucial because a failure in a power plant may cause a general breakdown in an electric grid. This situation might result in a disruption of electric service to customers....
متن کاملLong Term Cost Effective Preventive Maintenance Scheduling
Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...
متن کاملDevelopment of a new low-cost procedure for wind farm maintenance with a view to decrease soil pollution
The purpose of this article is to present the development of a wind farm, with a condition monitoring system (CMS) based on control charts as the algorithm, centred on a new index, to prevent soil pollution by oil spills in wind farms. To this end, temperature sensors can be considered as one of the more significant sensors to be employed in this study, because the information obtained with reg...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Wind energy science
سال: 2021
ISSN: ['2366-7451', '2366-7443']
DOI: https://doi.org/10.5194/wes-6-949-2021