In the implementation of projects, various obstacles are often encountered which cause delays have an impact not only on duration but also costs incurred. These constraints can be in form a lack resources, weather factors to social factors. Thus, it is necessary accelerate and optimize what done overcome delay. As well as efficient resource management. One acceleration methods that used Crashing method. them application crashing method Ringinrejo - BTS road construction project. Regency. Malang STA 2+350 – 6+300 experienced its implementation. After analyzing remaining work, work was 273 days or completed December 31, 2022. initial planning, project scheduled for completion October 3, 2022, so based this, delay 89 days. The total minimum fee must incurred IDR 1,524,960.00 with additional 21,180,000.00 per day. Daily productivity ordinary excavation works, originally 303.20 m³/hour, increased 909.59 m³/hour. For daily embankment 371.92 m³/hour 743.84 330.91 661.81 using existing critical paths, known became 184 by adding number heavy equipment. 1,524,960,000

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Traffic Impact Simulation for Road Construction Project

With the increasing traffic contradiction between supply and demand, urban traffic problems have become quite complex. Reasons for traffic congestion have become much more diverse. During the construction of urban road project, the surrounding road network will encounter a huge impact, traffic problems therefore emerged. Simulation is an important means for transport impact assessment, which ha...

متن کامل

Modelling of Construction Project Management Effectiveness by Applying Neural Networks

The paper presents modelling of construction project management effectiveness from the perspective of construction management organization. Construction projects performance data from construction management companies in Lithuania and the United States of America was collected and used for model development. Construction project management effectiveness model (CPMEM) was established by using ar...

متن کامل

Performance Indicators for Successful Construction Project Performance

The construction industry is generally considered to have under performed compared to other industries. Not only that, the UK construction industry has been criticised for not performing at the same level as that of other developed countries. In relation to this, the UK working groups on Key Performance Indicators (KPIs) have identified ten parameters for benchmarking projects, in order to achi...

متن کامل

Relationship between Safety Investment and Safety Performance Indices Considering the Project Hazard Level in Construction Industry

Introduction: Each country needs to preserve its human capital through preventing accidents for its development. Therefore, this study is carried out to study the relationship between safety investments and safety performance indices considering the interactive effect of the project hazard level in construction industry. Material and Methods: This study was conducted using multiple case studie...

متن کامل

Identifying and evaluating individual factors of project manager contributing to project success in project-based organizations

In recent years, The importance key success factors  has led organizations to focus more on these factors. project management is one of the factors greatly affecting project success. Having a qualified and competent project manager is the first step to actual project success. In this study, the individual factors and important competencies of the project manager have been investigated. The sta...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Advance Sustainable Science, Engineering and Technology (ASSET)

سال: 2023

ISSN: ['2715-4211']

DOI: https://doi.org/10.26877/asset.v5i2.15944