Phase II Performance of P-Charts and P'-Charts

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Robust economic-statistical design of the EWMA-R control charts for phase II linear profile monitoring

Control charts are powerful tools to monitor quality characteristics of services or production processes. However, in some processes, the performance of process or product cannot be controlled by monitoring a characteristic; instead, they require to be controlled by a function that usually refers as a profile. This study suggests employing exponentially weighted moving average (EWMA) and range ...

متن کامل

Using P-Values To Design Statistical Process Control Charts

Conventional Phase II statistical process control (SPC) charts are designed using control limits; a chart gives a signal of process distributional shift when its charting statistic exceeds a properly chosen control limit. To do so, we only know whether a chart is out-of-control (OC) at a given time. It is therefore not informative enough about the likelihood of a potential distributional shift....

متن کامل

Enhancing the performance of EWMA charts

Control charts are extensively used in processes and are very helpful in determining the special cause variations so that a timely action may be taken to eliminate them. One of the charting procedures is the Shewhart-type control charts, which are used mainly to detect large shifts. Two alternatives to the Shewhart-type control charts are the cumulative (CUSUM) control charts and the exponentia...

متن کامل

Improving the performance of CUSUM charts

The control chart is an important statistical technique that is used to monitor the quality of a process. Shewhart control charts are used to detect larger disturbances in the process parameters, whereas CUSUM and EWMA charts are meant for smaller and moderate changes. Runs rules schemes are generally used to enhance the performance of Shewhart control charts. In this study, we propose two runs...

متن کامل

Simplified Approach Charts Improve Data Retrieval Performance

The effectiveness of different instrument approach charts to deliver minimum visibility and altitude information during airport equipment outages was investigated. Eighteen pilots flew simulated instrument approaches in three conditions: (a) normal operations using a standard approach chart (standard-normal), (b) equipment outage conditions using a standard approach chart (standard-outage), and...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Medical Statistics and Informatics

سال: 2018

ISSN: 2053-7662

DOI: 10.7243/2053-7662-6-3