Post-M&A Performance and Failure: Implications of Time until Deal Completion
نویسندگان
چکیده
منابع مشابه
the effects of time planning and task complexity on accuracy of narrative task performance
هدف اصلی این تحقیق بررسی تاثیر برنامه ریزی زمانی، هم چنین افزایش میزان پیچیدگی تکالیف در نظر گرفته شده بصورت همزمان، بر دقت و صحت و پیچیدگی عملکرد نوشتاری زبان آموزان می باشد. بدین منظور، 50 نفر از دانش آموزان دختر در رده ی سنی 16 الی 18 سال به عنوان شرکت کنندگان در این زمینه ی تحقیق در نظر گرفته شدند و به دو گروه آزمایشی و کنترل بصورت اتفاقی تقسیم شدند. اعضای گروه آزمایشی هر دو تکلیف ساده و پی...
a comparative move analysis of the introduction sections of ma theses by iranian and native post-graduate students
since esp received universal attention to smooth the path for academic studies and productions, a great deal of research and studies have been directed towards this area. swales’ (1990) model of ra introduction move analysis has served a pioneering role of guiding many relevant studies and has proven to be productive in terms of helpful guidelines that are the outcome of voluminous productions ...
15 صفحه اولPost-transcriptional spliceosomes are retained in nuclear speckles until splicing completion.
There is little quantitative information regarding how much splicing occurs co-transcriptionally in higher eukaryotes, and it remains unclear where precisely splicing occurs in the nucleus. Here we determine the global extent of co- and post-transcriptional splicing in mammalian cells, and their respective subnuclear locations, using antibodies that specifically recognize phosphorylated SF3b155...
متن کاملthe effects of planning on accuracy and complexity of iranian efl students’ written narrative task performance
this study compared the different effects of form-focused guided planning vs. meaning-focused guided planning on iranian pre-intermediate students’ task performance. the study lasted for three weeks and concentrated on eight english structures. forty five pre-intermediate iranian students were randomly assigned to three groups of guided planning focus-on-form group (gpfg), guided planning focus...
15 صفحه اولEvaluating project’s completion time with Q-learning
Nowadays project management is a key component in introductory operations management. The educators and the researchers in these areas advocate representing a project as a network and applying the solution approaches for network models to them to assist project managers to monitor their completion. In this paper, we evaluated project’s completion time utilizing the Q-learning algorithm. So the ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainability
سال: 2020
ISSN: 2071-1050
DOI: 10.3390/su12072999