Practice Framework for the Management of Post-Disaster Housing Reconstruction Programmes
نویسندگان
چکیده
منابع مشابه
A Meta-study of Architectural Design Processes in Post-disaster Housing Reconstruction in Iran
Background and objective Despite conducting numerous studies in the two areas of “architectural design process” and “post-disaster housing reconstruction” in recent years in Iran, limited studies have been conducted for the meta-study of these two areas. Therefore, to redefine the “post-disaster housing reconstruction” and strengthen the common theoretical foundations, the current study aims to...
متن کاملPost-Disaster Housing Reconstruction in Sri Lanka: What Methodology?
Research methodology is the procedural framework within which the research is conducted. This includes the overall approach to a problem that could be put into practice in a research process, from the theoretical underpinning to the collection and analysis of data. Choice of methodology depends on the primary drivers: topic to be researched and the specific research questions. Hence, methodolog...
متن کاملPost-disaster housing reconstruction and social inequality: a challenge to policy and practice.
In post-disaster reconstruction the social aspects of housing provision are important for the success of both emergency shelters and permanent housing, particularly in settlements that have been permanently relocated or entirety rebuilt. The social dimensions of housing reconstruction after disaster are discussed in the context of the long-term effects of reconstruction after the Yungay, Peru E...
متن کاملA planning framework for post-disaster collective shelters
Background and objective: Accommodation of the victims is necessary immediately after the accident to maintain order and reduce mental, psychological and physical crises, as well as providing better services to the victims of the accident. The experience of the AQ-Qala flood and the temporary accommodation of the victims in sports venues has made the need for the design of a collective shelter ...
متن کاملMechanism for selecting the appropriate decision-making model for Temporary Post-Disaster Housing
Background and objective: Disaster, natural or else, are phenomena that occur suddenly and unknowingly, and therefore in most cases, it is difficult to deal with them in a principled and rapid manner. The main reason for this is that the duration of these phenomena is relatively short and it can be psychologically difficult to show a quick and appropriate reaction due to the existing fear. Ther...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainability
سال: 2018
ISSN: 2071-1050
DOI: 10.3390/su10113929