PREPARE BIM PROJECT EXECUTION PLAN

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Development of BIM Execution Plan for BIM Model Management during the Pre-Operation Phase: A Case Study

Building information modeling (BIM) technologies use precise geometry and relevant data to enhance and improve the maintenance performance of facilities integrated with 3D object-oriented computer aided design (CAD). Although most owners agree on the potential benefits of integrating BIM technologies with facility management (FM), they must overcome many problems to plan and develop effective B...

متن کامل

Plan Execution for Autonomous

The New Millennium Remote Agent (NMRA) will be the rst AI system to control an actual spacecraft. The spacecraft domain raises a number of challenges for planning and execution, ranging from extended agency and long-term planning to dynamic recoveries and robust concurrent execution , all in the presence of tight real-time deadlines , changing goals, scarce resource constraints, and a wide vari...

متن کامل

Plan Execution for Autonomous Spacecraft

The New Millennium Remote Agent (NMRA) vSll be the first AI system to control an actual spacecraft. The spacecraft domain raises a number of challenges for planning and execution, ranging from extended agency and long-term planning to dynamic recoveries and robust concurrent execution, all in the presence of tight real-time deadlines, changing goals, scarce resource constraints, and a v-ide var...

متن کامل

Plan Execution in Dynamic Environments

This paper deals with plan execution on agents/robots in highly dynamic environments. Besides a formal semantics of plan execution and a representation of plans as programs, we introduce the concept of plan invariants. Plan invariants are similar to loop invariants in imperative programs in that they have to be true during the whole plan execution cycle. Once a plan invariant fails the plan exe...

متن کامل

Monitoring Plan Optimality During Execution

A great deal of research has addressed the problem of generating optimal plans, but these plans are of limited use in circumstances where noisy sensors, unanticipated exogenous actions, or imperfect models result in discrepancies between predicted and observed states of the world during plan execution. Such discrepancies bring into question the continued optimality of the plan being executed an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Al-Azhar University Engineering Sector

سال: 2019

ISSN: 1687-8418

DOI: 10.21608/auej.2019.64154