Probabilistic Risk Metrics for Navigating Occluded Intersections
نویسندگان
چکیده
منابع مشابه
Metrics for Probabilistic Geometries
We investigate the geometrical structure of probabilistic generative dimensionality reduction models using the tools of Riemannian geometry. We explicitly define a distribution over the natural metric given by the models. We provide the necessary algorithms to compute expected metric tensors where the distribution over mappings is given by a Gaussian process. We treat the corresponding latent v...
متن کاملNavigating Intersections with Autonomous Vehicles using Deep Reinforcement Learning
Providing an efficient strategy to navigate safely through unsignaled intersections is a difficult task that requires determining the intent of other drivers. We explore the effectiveness of Deep Reinforcement Learning to handle intersection problems. Using recent advances in Deep RL, we are able to learn policies that surpass the performance of a commonly-used heuristic approach in several met...
متن کاملCalabi-Yau Metrics for Quotients and Complete Intersections
We extend previous computations of Calabi-Yau metrics on projective hypersurfaces to free quotients, complete intersections, and free quotients of complete intersections. In particular, we construct these metrics on generic quintics, four-generation quotients of the quintic, Schoen CalabiYau complete intersections and the quotient of a Schoen manifold with Z3 × Z3 fundamental group that was pre...
متن کاملStanford: Probabilistic Edit Distance Metrics for STS
This paper describes Stanford University’s submission to SemEval 2012 Semantic Textual Similarity (STS) shared evaluation task. Our proposed metric computes probabilistic edit distance as predictions of semantic similarity. We learn weighted edit distance in a probabilistic finite state machine (pFSM) model, where state transitions correspond to edit operations. While standard edit distance mod...
متن کاملA Statistical-Probabilistic Pattern for Determination of Tunnel Advance Step by Quantitative Risk Analysis
One of the main challenges faced in design and construction phases of tunneling projects is the determination of maximum allowable advance step to maximize excavation rate and reduce project delivery time. Considering the complexity of determining this factor and unexpected risks associated with inappropriate determination of that, it is necessary to employ a method which is capable of accounti...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Robotics and Automation Letters
سال: 2019
ISSN: 2377-3766,2377-3774
DOI: 10.1109/lra.2019.2931823