Project management under uncertainty: using flexible resource management to exploit schedule flexibility
نویسندگان
چکیده
منابع مشابه
Flexible waste management under uncertainty
In this paper, we use stochastic dynamic programming to model the choice of a municipality which has to design an optimal waste management program under uncertainty about the price of recyclables in the secondary market. The municipality can, by undertaking an irreversible investment, adopt a exible program which integrates the existing land ll strategy with recycling, keeping the option to sw...
متن کاملFlexible resource management and its effect on project cost and duration
In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported ...
متن کاملSustainable water resource management under hydrological uncertainty
[1] A proper understanding of the sources and effects of uncertainty is needed to achieve the goals of reliability and sustainability in water resource management and planning. Many studies have focused on uncertainties relating to climate inputs (e.g., precipitation and temperature), as well as those related to supply and demand relationships. In the end-to-end projection of the hydrological i...
متن کاملA Multi-level Approach to Project Management under Uncertainty
Project management decisions are made at the strategic, the tactical and the operational level. These decision levels are unarguably interrelated. Uncertainty in project management is primarily dealt with at an operational level by detecting operational risks and deciding on how to respond to them such that the tactical objectives can be met. We stress some major issues regarding the topics of ...
متن کاملAllocating Time and Resources in Project Management Under Uncertainty
We define and develop a solution approach for planning, scheduling and managing project efforts where there is significant uncertainty in the duration, resource requirements and outcomes of individual tasks. Our approach yields a nonlinear optimization model for allocation of resources and available time to tasks. This formulation represents a significantly different view of project planning fr...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: European J. of Industrial Engineering
سال: 2020
ISSN: 1751-5254,1751-5262
DOI: 10.1504/ejie.2020.109899