Project Management using Critical Path Method (CPM): A Pragmatic Study

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Collaborative Project Management (CPM)

Zulieferer übernehmen inzwischen immer umfangreichere Aufgaben in der Entwicklung und Produktion, was zu neuen Herausforderungen im Projektmanagement führt. Nach VDA (2003) sind deshalb neue Formen der Zusammenarbeit zwischen Projektpartnern notwendig. Aus diesem Grund initiierten BMW und Daimler gemeinsam mit großen Zulieferern wie ZF Friedrichshafen, Karmann und Keiper beim ProSTEP iViP Verei...

متن کامل

Resilient Project Management, A New Approache to Develop Project Management Knowledge (Case Study: Infrastructure Civil Projects Management)

Accepetance of the fact that the working context of civil projects is challenging can enhance the resiliency capacity and will increase the project management concentration for improving and developing the software and hardware capabilities to facilitate project success achievement. This article is documented based on a research results in macro-hydropower plants projects management context to ...

متن کامل

Analysis of critical paths in a project network with random fuzzy activity times

Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...

متن کامل

Fuzzy Critical Path Problem for Project Network

The task of finding the crisp critical path has received researcher’s attention over the past two decades which has wide range of applications in planning and scheduling the large projects. In most cases of our life, the data obtained for decision makers are only approximate, which gives rise to fuzzy critical path problem. In this paper, new ranking methods are introduced to identify the fuzzy...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Global Journal of Pure and Applied Sciences

سال: 2013

ISSN: 1118-0579

DOI: 10.4314/gjpas.v18i3-4.11