Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode

Rail mounted gantry crane (RMGC) scheduling is important in reducing makespan of handling operation and improving container handling efficiency. In this paper, we present an RMGC scheduling optimization model, whose objective is to determine an optimization handling sequence in order to minimize RMGC idle load time in handling tasks. An ant colony optimization is proposed to obtain near optimal...

متن کامل

The Integrated Optimization of Quay Crane-Yard Truck Scheduling in the Container Terminal with Uncertain Factors

The key to improve the container terminal efficiency is the integrated optimization of the quay crane (QC) and the yard truck (YT) scheduling, which is normally settled separately and considered in a certain condition in classical literatures. To improve the operation efficiency and simulate the practical operation, a PSO-based integrated QC-YT scheduling optimization model with uncertain facto...

متن کامل

Yard crane scheduling in port container terminals using genetic algorithm

Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...

متن کامل

Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption

Container terminals mainly include three types of handling equipment, i.e., quay cranes (QCs), internal trucks (ITs) and yard cranes (YCs). Due to high cost of the handling equipment, container terminals can hardly purchase additional handling equipment. Therefore, the reasonable scheduling of these handling equipment, especially coordinated scheduling of the three types of handling equipment, ...

متن کامل

Quay Crane Allocation of Container Terminal Based on Cluster Analysis

Quay crane allocation is one of the most important scheduling plans in the container terminal. A large of production data is stored in the database of the terminal. This paper utilizes the method of data mining to analyze the problem of quay crane allocation by using these data. From the mining, valuable information has been gotten from the database. The paper chooses the fuzzy cmeans cluster a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Computational Intelligence and Neuroscience

سال: 2014

ISSN: 1687-5265,1687-5273

DOI: 10.1155/2014/682486