Random lead times in replenishment planning for single-level assembly systems: The value of information
نویسندگان
چکیده
منابع مشابه
Inventory Systems with Advance Demand Information and Random Replenishment Times
Advance demand information, when used effectively, improves the performance of production/inventory systems. The extent of improvement however depends on certain factors. We investigate the influence of random supply lead times on a single-stage inventory system with advance demand information. It is found that the supply lead time variability diminishes the benefits of advance demand information.
متن کاملMathematical Model for Supply Planning of Multi-Level Assembly Systems with Stochastic Lead Times
The deal for industrial companies is to satisfy their customers with the best quality, the most reliable lead times, and the lowest costs. One of the keys to achieve it is in the inventory control in the Supply Chain. Moreover, it is mandatory to possess necessary components in order to produce the requested products by the due date. But, as the components lead time is an unpredictable paramete...
متن کاملMulti-objective supply planning for two-level assembly systems with stochastic lead times
This paper considers two-level assembly systems whose lead times of components are stochastic with known discrete random distributions. In such a system, supply planning requires determination of release dates of components at level 2 in order to minimize expected holding cost and to maximize customer service. Hnaien et al. [Hnaien F, Delorme X, Dolgui A. Multi-objective optimization for invent...
متن کاملDetailed maintenance planning for military systems with random lead times and cannibalization
Detailed maintenance planning under uncertainty is one of the most important topics in military research and practice. As one of the fastest ways to recover failed weapon systems, cannibalization operations are commonly applied by maintenance personnel. Due to additional complexities introduced by these operations, detailed maintenance decision making with cannibalization was rarely studied in ...
متن کاملGenetic algorithm for multi-level assembly systems under stochastic lead times
The aim of this paper is to propose tools to adapt and parameterize the Material Requirement Planning (MRP) method under lead time uncertainty. We study multi-level assembly systems with one type of finished products and several types of components. We consider that each component has a fixed unit inventory cost and the finished product has a backlogging cost per unit of time. The lead times of...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IFAC-PapersOnLine
سال: 2017
ISSN: 2405-8963
DOI: 10.1016/j.ifacol.2017.08.343