Restoring connectivity in a resource constrained WSN
نویسندگان
چکیده
منابع مشابه
Connectivity Restoration In Partitioned WSN, A Review
Partitioning in wireless sensor network is an important aspect of research in wireless networks. Clusters or partitions in the network can be formed on the basis of either geographical area of the nodes or on the basis of some performance parameters. Also the nodes which form the cluster are either homogenous or heterogeneous in nature. In this paper a review of the various techniques proposed ...
متن کاملA THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...
متن کاملDemo: Deploying a Drone to Restore Connectivity in a WSN
This paper describes our demonstration of a network repair problem where a drone places a new sensor node to replace a failed node in order to heal the connectivity for a Wireless Sensor Network (WSN). It serves to show the potential of our published solutions for automated network repair when the repairing agent is a drone.
متن کاملConstrained Renewable Resource Allocation in Fuzzy Metagraphs via Min-Slack
This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...
متن کاملA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Network and Computer Applications
سال: 2016
ISSN: 1084-8045
DOI: 10.1016/j.jnca.2016.03.009