Risk Management Practice Adopted in Road Construction Project
نویسندگان
چکیده
Purpose: Zero risk construction is only a dream not reality as there nothing certainity in the real world and scientists are capable of coverting same into with high level data science. The practice management an attempt to highlight elements case urban road Sindhupalchowk district, Province 3, Nepal. Design/Methodology/Approach: 5-point Likert scale questionnaire survey was done collect primary data. Risk Management Practice documented based on response percentage through charts graphs. Field visit were for visual assessment procedure along key informant interview Secondary Detail Project Reports, Design Drawings effectively analyzed. Cronbach’s alpha used measure reliability triangulations validity. Findings/Result: results from this research indicates that contractor’s organization averagely aware mean score 3.30 about practicing formally 2.83. They analyzing techniques 3.07. Mean slightly higher client’s perspective awareness being 3.93 practiced 3.13. analysis 3.40. Mostly adopted technique identification monitoring evaluation report similar past projects direct judgment widely at district both perspective. strategy preparing contingency plan whereas client transfer risk. Originality/Value: It action which significant professional understand practices by Nepalese Contractors hilly region Paper Type: Ex-Post Facto Research
منابع مشابه
A fuzzy group decision making approach to construction project risk management
Implementation of the risk management concepts into construction practice may enhance the performance of project by taking appropriate response actions against identified risks. This research proposes a multi-criteria group decision making approach for the evaluation of different alternative response scenarios. To take into account the uncertainties inherent in evaluation process, fuzzy logic i...
متن کاملDetermining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملAnalysis of interactions among barriers in project risk management
In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success...
متن کاملUsing fuzzy FMEA and fuzzy logic in project risk management
Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...
متن کاملRisk Management in Construction Project Using Agent-Based Simulation
In recent years, intensive research and development have been done in the area of construction project risk management. Indeed, an efficient risk management is mandatory to project success. However, implementing such a management is complex because of the diversity and the dynamic nature of the risk. Moreover, each of the project stakeholders has his/her own risks, his/her own vision and his/he...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International journal of management, technology, and social science
سال: 2022
ISSN: ['2581-6012']
DOI: https://doi.org/10.47992/ijmts.2581.6012.0175