Scheduling with job rejection and nonsimultaneous machine available time on unrelated parallel machines

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Flexible flowshop scheduling with equal number of unrelated parallel machines

This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...

متن کامل

Scheduling on Uniform Nonsimultaneous Parallel Machines

We consider the problem of scheduling on uniform processors which may not start processing at the same time with the purpose of minimizing the maximum completion time. We give a variant of the Multifit algorithm which generates schedules which end within 1.382 times the optimal maximum completion time for the general problem, and within √ 6/2 times the optimal maximum completion time for proble...

متن کامل

Unrelated parallel machine scheduling with dedicated machines and common deadline

http://dx.doi.org/10.1016/j.cie.2014.05.012 0360-8352/ 2014 Elsevier Ltd. All rights reserved. q This manuscript was processed by Area Editor Hans Kellerer. ⇑ Corresponding author. Address: Department of Industrial Management, National Taiwan University of Science and Technology, 43 Keelung Road, Section 4, Taipei 106, Taiwan. Tel.: +886 2 2737 6337. E-mail address: [email protected] (C....

متن کامل

flexible flowshop scheduling with equal number of unrelated parallel machines

this article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. the objective is to minimize the makespan for a given set of jobs in the system. this problem class is np-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. a number of test problems are randomly ge...

متن کامل

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Theoretical Computer Science

سال: 2016

ISSN: 0304-3975

DOI: 10.1016/j.tcs.2015.12.020