Selecting sustainable teams for PPP projects
نویسندگان
چکیده
منابع مشابه
Structuring Equity Investment in Ppp Projects
Earlier studies have established guidelines to optimize the capital structure of a privatized project. However, in the US, many Public-Private Partnership (PPP) projects may not be fully self-financed through toll or other operating revenues due to insufficient revenue streams. With the limited debt capacity secured by toll revenues, most PPP projects must be backed by both private equity inves...
متن کاملdesigning a model for selecting construction projects in public sector
much research hasn’t been done in the area of project selection in the public sector. in this paper, we tried to choose projects in the public sector, and a linear programming model is presented. in an effort to build the model, the decision criteria were identified using the delphi method and then the criteria were reviewed at conceptual combining. the model was constructed in a linear, goal a...
متن کاملA MATHEMATICAL MODEL FOR SELECTING THE PROJECT RISK RESPONSES IN CONSTRUCTION PROJECTS
Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and independent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. ...
متن کاملdesigning a decision making model for selecting technology transfer projects
in this paper, first, a conceptual framework has been developed and while truly recognizing different aspects of the technology transfer process, it is trying to introduce a decision-making methodology in the choice of projects. then by choosing effective variables in technology transfer process, a multiple criteria decision-making (mcdm) model has been designed, so that the choice of appropria...
متن کاملmodel to selecting contractors in software projects
organizations in private and public sector assign many projects in information technology (particularly software) field to contractors for implementation every year. previous experiences shows that most of these projects are stopped before finishing or cannot meet the expected results. based on studies related to this issue, many of failures depend on implementation contractor, directly or indi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Building and Environment
سال: 2008
ISSN: 0360-1323
DOI: 10.1016/j.buildenv.2007.02.001