Solving Level Scheduling in Mixed Model Assembly Line by Simulated Annealing Method

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving Level Scheduling in Mixed Model Assembly Line by Simulated Annealing Method

This paper presents an application of the simulated annealing algorithm to solve level schedules in mixed model assembly line. Solving production sequences with both number of setups and material usage rates to the minimum rate will optimize the level schedule. Miltenburg algorithm (1989) is first used to get seed sequence to optimize further. For this the utility time of the line and setup tim...

متن کامل

Sequencing Mixed Model Assembly Line Problem to Minimize Line Stoppages Cost by a Modified Simulated Annealing Algorithm Based on Cloud Theory

This research presents a new application of the cloud theory-based simulated annealing algorithm to solve mixed model assembly line sequencing problems where line stoppage cost is expected to be optimized. This objective is highly significant in mixed model assembly line sequencing problems based on just-in-time production system. Moreover, this type of problem is NP-hard and solving this probl...

متن کامل

sequencing mixed model assembly line problem to minimize line stoppages cost by a modified simulated annealing algorithm based on cloud theory

this research presents a new application of the cloud theory-based simulated annealing algorithm to solve mixed model assembly line sequencing problems where line stoppage cost is expected to be optimized. this objective is highly significant in mixed model assembly line sequencing problems based on just-in-time production system. moreover, this type of problem is np-hard and solving this probl...

متن کامل

Solving Bus Terminal Location Problem Using Simulated Annealing Method

Bus network design is an important problem in public transportation. A main step to this design is determining the number of required terminals and their locations. This is a special type of facility location problem, which is a time-consuming, large scale, combinatorial problem. In a previous attempt by the authors, this problem had been solved by GAMS, based on a branch and bound algorithm.&...

متن کامل

Solving a mixed-integer linear programming model for a multi-skilled project scheduling problem by simulated annealing

Article history: Received July 20, 2011 Received in Revised form October, 12, 2011 Accepted 15 October 2011 Available online 20 October 2011 A multi-skilled project scheduling problem (MSPSP) has been generally presented to schedule a project with staff members as resources. Each activity in project network requires different skills and also staff members have different skills, too. This causes...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Circuits and Systems

سال: 2016

ISSN: 2153-1285,2153-1293

DOI: 10.4236/cs.2016.76078