One of the basic and significant problems that a shop or a factory manager encounters is a suitable scheduling and sequencing of jobs on machines. One type of scheduling problem is just-in-time scheduling. Motivated by just-intime manufacturing, we consider the multi-objective pr
1. Experiment design for parameters settings in SPGA There are several parameters that may influence the performance of the algorithm. For example, the larger population size may find better solution quality but cost larger computational expense. When the number of sub-population
This paper develops a fuzzy multi-objective linear programming (FMOLP) model for solving a multiobjective single-machine scheduling problem. The proposed model attempts to minimize the total weighted tardiness andmakespan simultaneously. In this problem, a proposed FMOLPmethod is
In this paper, three criteria scheduling problem of n jobs on a single machine is considered. Each these to be processed without interruption and becomes available for processing at time zero. The minimize objectives simultaneously, which are the completion time, maximum tardines
This work addresses the unrelated parallel machine scheduling problem where setup times are sequence-dependent and machine-dependent. The maximum completion time of the schedule, known as makespan, is considered as an objective to minimize. Few studies has been done about this pr
This paper deals with the Unrelated Parallel Machine Scheduling Problem with Setup Times (UPMSPST). The objective is to minimize the maximum completion time of the schedule, the so-called makespan. This problem is commonly found in industrial processes like textile manufacturing