Subcontractors’ liability for project delay

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

Development of a forward chain approach for calculating self-delay of project activities

In the field of management, the delay within projects is a prominent and contentious issue. Due to the fact that delay leads to cost and time over-runs, it is often the subject of litigation claims and creation of managerial tensions. In a bid to bring such delays under control and also to diminish managerial tensions, it is necessary to recognize and understand the following four concepts:"typ...

متن کامل

Civil Liability for Environmental Damage

Protecting nature and preserving its health is emphasized by different religions and human mind. Enjoying a healthy environment is a fundamental human right. Any damage to the environment requires compensation of damages incurred, which is within the scope of civil liability. The key question here is what is the nature of civil liability for environmental damage? How does choosing the right nat...

متن کامل

Collecting Liability for Compensation for Medical Accidents

Compensation for damages caused by medical accidents is one of the important issues that have led to the transformation of social life into responsibility. The increasing number of accidents caused by medical practices and the consequent increase in casualties to patients makes it more than necessary to investigate the issue. While the legal system of some countries, including France, has taken...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Financial Management of Property and Construction

سال: 2005

ISSN: 1366-4387

DOI: 10.1108/13664380580001068