Subjective and Objective Analysis of Schedule Delaying Factors for Container Shipping Lines

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Quantity discount pricing for container transportation services by shipping lines

Because transportation services provided by container lines to forwarders cannot be stored, they can be considered to be newsvendor-type products. This paper discusses a method used to optimize container lines’ freight tariffs in order to maximize their expected profit by considering changes in order quantities made by forwarders responding to the price schemes suggested by the container lines....

متن کامل

Improving Packing Efficiency for Shipping Container

This present paper focused on the efficiency improvement on the container packing. The modified genetic algorithm (MGA) was developed to find the solution of arranging heterogeneous boxes into containers with a standardised dimension. The proposed MGA included an elitist strategy and flexible arranging sequence (FAS). Five instant datasets were used in the computational experiments aiming to be...

متن کامل

Optimization in container liner shipping

We will gives an overview of several decision problem encountered in liner shipping. We will cover problems on the strategic, tactical and operational planning levels as well as problems that can be considered at two planning levels simultaneously. Furthermore, we will shortly discuss some related problems in terminals, geographical bottlenecks for container ships and provide an overview of ope...

متن کامل

Key Factors Analysis of Strategic Alliances in Container Liner Shipping Industry

International container shipping industry experiences important innovation after the 1980s. This is caused by the progress of Asian shipping to stay abreast of the economic development and the authorization of the revised US Shipping Act in 1984. Before the act, container shipping industry is exempt from antitrust law. The act is intended to loosen regulation and promote competition. Consequent...

متن کامل

Process Analysis in Container Shipping Network Structure Form Change

Being aimed at the influence of ship-size and cargo-demand changes on container shipping networks, to reveal the evolution process of container shipping networks structure form, this paper respectively designed the operation models for two major container shipping networks structure forms: Multi-port-calling network and Hub-and-spoke network, to maximizing the investment efficiency. Based on th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of International Logistics and Trade

سال: 2020

ISSN: 1738-2122,2508-7592

DOI: 10.24006/jilt.2020.18.4.181