Throughput and delay analysis for IEEE 802.11 multi-hop networks considering data rate

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Throughput Maximization for Multi-Slot Data Transmission via Two-Hop DF SWIPT-Based UAV System

In this paper, an unmanned aerial vehicle (UAV) assisted cooperative communication system is studied, wherein a source transmits information to the destination through an energy harvesting decode-and-forward UAV. It is assumed that the UAV can freely move in between the source-destination pair to set up line of sight communications with the both nodes. Since the battery of the UAV may be limite...

متن کامل

Analyzing the Effective Throughput in Multi-Hop IEEE 802.11n Networks

In this paper we characterize the effective throughput for multi-hop paths in IEEE 802.11n based wireless mesh networks. We derive an analytical model capturing the effects of frame aggregation and block acknowledgements, features found in the new IEEE 802.11n standard. We describe the throughput at MAC layer as a function of bit error rate, aggregation level and path length. Using the results ...

متن کامل

A Queueing Network Model for Delay and Throughput Analysis in Multi-hop Wireless Ad Hoc Networks

In this paper we present a queueing network model for computing average end-to-end delay, and maximum throughput that can be attained in random access multi-hop wireless ad hoc networks with stationary nodes under two popular contention resolution schemes namely, Binary Exponential Back-off (BEB) and Double Increment Double Decrement (DIDD) rules. This model takes into consider some realistic f...

متن کامل

End-to-end throughput analysis for IEEE 802.11e EDCA string-topology wireless multi-hop networks

This paper proposes analytical expressions of end-to-end throughput for IEEE 802.11e Enhanced Distributed Channel Access (EDCA) wireless string-topology multi-hop networks. For obtaining the IEEE 802.11e EDCA performance, internal collisions between Access Categories (ACs) in a node, frame collisions with external nodes, and frame-existence probabilities of buffers at each AC are expressed as f...

متن کامل

Maximum Throughput Analysis for IEEE 802.11 String Topology Wireless Multi-hop Networks using Markov-Chain Model

In this paper, analytical model for IEEE 802.11 multi-hop network taking into account DCF mechanism are introduced. By combining airtime concept and Bianchi model, the relationship between the duration for backoff timer decrement and that for frame transmission can be considered. Maximum throughput of multi-hop network for any frame size is obtained. Obtained analytical expressions are verified...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Distributed Sensor Networks

سال: 2020

ISSN: 1550-1477,1550-1477

DOI: 10.1177/1550147720959262