Total Completion Time Scheduling Problem with Temperature Considerations

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time

Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...

متن کامل

A Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time

Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...

متن کامل

Scheduling with Rejection to Minimize the Total Weighted Completion Time∗

In this paper, we address the scheduling problem with rejection in which we can choose a subset of jobs to process. Choosing not to process any job incurs a corresponding penalty. We consider the following problem for the first time: scheduling with rejection to minimize the total weighted completion time with the constraint of total penalties on identical parallel machines, where the number of...

متن کامل

Three-Machine Flowshop Scheduling Problem to Minimize Total Completion Time with Bounded Setup and Processing Times

The three-machine flowshop scheduling problem to minimize total completion time is studied where setup times are treated as separate from processing times. Setup and processing times of all jobs on all machines are unknown variables before the actual occurrence of these times. The lower and upper bounds for setup and processing times of each job on each machine is the only information that is a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Nevşehir Bilim ve Teknoloji Dergisi

سال: 2016

ISSN: 2148-466X

DOI: 10.17100/nevbiltek.284741