Use of Integrated AHP-Topsis Method in Selection of Optimum Mine Planning for Open-Pit Mines
نویسندگان
چکیده
منابع مشابه
Commodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method
Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...
متن کاملThe effect of price changes on optimum cut-off grade of different open-pit mines
Maximizing economic earnings is the most common goal in cut-off grade optimization of open-pit mining operations. When this is the case, the price of the product has a critical effect on optimum value of cut-off grade. This paper investigates the relationship between optimum cut-off grade and price to maximize total cash flow and net percent value (NPV) of operation. In order to visualize this ...
متن کاملAnalyzing the effect of ore grade uncertainty in open pit mine planning; A case study of Rezvan iron mine, Iran
Due to uncertain nature of grade in ore deposits, considering uncertainty is inevitable in geological modelling of resources and mine planning. In other words, uncertainty in grade of mineralized materials, is one of the most significant parameters need attention in mine planning. In this paper, a comparative procedure utilizing Sequential Gaussian Simulation (SGS) and traditional Ordinary Krig...
متن کاملDevelopment of a goal programming model for optimization of truck allocation in open pit mines
Truck and shovel operations comprise approximately 60% of the total operating costs in open pit mines. In order to increase productivity and reduce the cost of mining operations, it is essential to manage the equipment used with high efficiency. In this work, the chance-constrained goal programing (CCGP) model presented by Michalakopoulos and Panagiotou is developed to determine an optimal truc...
متن کاملA continuous model for open pit mine planning∗
This paper proposes a new mathematical model for the open pit mine planning problem, based on continuous functional analysis. The traditional models for this problem have been constructed by using discrete 0−1 decision variables, giving rise to large-scale combinatorial and Mixed Integer Programming (MIP) problems. Instead, we use a continuous approach which allows for a refined imposition of s...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Archives of Mining Sciences
سال: 2023
ISSN: ['0860-7001', '1689-0469']
DOI: https://doi.org/10.24425/ams.2023.144316