Using simulation to quantify uncertainty in ultimate-pit limits and inform infrastructure placement

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Determination of Ultimate Pit Limits in Open Mines Using Real Option Approach

Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...

متن کامل

A New Algorithm for Determining Ultimate Pit Limits Based on Network Optimization

One of the main concerns of the mining industry is to determine ultimate pit limits. Final pit is a collection of blocks, which can be removed with maximum profit while following restrictions on the slope of the mine’s walls. The size, location and final shape of an open-pit are very important in designing the location of waste dumps, stockpiles, processing plants, access roads and other surfac...

متن کامل

Risk Averse Approaches in Open-pit Production Planning under Ore Grade Uncertainty: a Ultimate Pit Study

During early phases of open-pit mining production planning many parameters are uncertain, and since the mining operation is performed only once, any evaluations based only on on average outcomes neglects the very real chance of obtaining an outcome that is below average. Taking into account also that operation costs are considerable and the mining horizon usually extends over several decades it...

متن کامل

Determination of Ultimate Pit Limits in Open Mines Using Real Option Approach

Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...

متن کامل

Using 2D Lerchs and Grossmann Algorithm to Design Final Pit Limits of Sungun Copper Deposit of Iran (TECHNICAL NOTE)

The Sungun copper deposit is located in about 40km north west of Ahar city in the east Azarbaigan province of Iran. The total geological ore deposit is estimated to be 740 million tons. In this study using all information from exploration and geotechnical studies of the area, final pit limits of Sungun copper deposit is designed by the 2-D Lerchs & Grossmann Algorithm. By this method, from 740 ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mining Engineering

سال: 2015

ISSN: 0026-5187

DOI: 10.19150/me.6411