VANET Aided D2D Discovery: Delay Analysis and Performance

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

VANET: Expected Delay Analysis for Location Aided Routing (LAR) Protocol

Submitted in April, 2016; Accepted in July, 2016 Abstract – The Vehicular Ad-hoc Network (VANET) is a networking technology uses to create wireless network using mobile vehicles. In this network, the mobile vehicles work as intermediate node to transmit data packets over the wireless network and mobile nodes are free to move from one network to other network. All nodes in VANETs are highly mova...

متن کامل

Performance Analysis in Routing Protocols for VANET

The performance of VANET remains optimum within thousand meters and after that due to high packet loss rate communication among vehicles is not feasible. Finding optimal path is a typical task for dynamic protocols. The research objective is to study some of the important QOS metrics in VANET & vehicular traffic management solutions to improve overall safety of traffic. Keywords— Vehicular Ad h...

متن کامل

Performance Analysis of MANET and VANET based on Throughput Parameter

The Quality of Service (QoS) provides a better performance in networking environment like MANET and VANET in the current development scenario. In these fields the topology is dynamic in nature changing frequently with respect to time. Thus it creates many challenging issues too. In this paper, we have investigated the performance of MANET and VANET based on QoS, where throughput is taken as the...

متن کامل

Interfacing Computer Aided Parallelization and Performance Analysis

When porting sequential application_ to parallel computer architectures, the program developer will typically go through several cycles of source code optimization and performance analysis. We have started a project to develop an environment where the user can jointly navigate through program structure and performance data information in order to make efficient optimization decisions. In a prot...

متن کامل

Drug Discovery Acceleration Using Digital Microfluidic Biochip Architecture and Computer-aided-design Flow

A Digital Microfluidic Biochip (DMFB) offers a promising platform for medical diagnostics, DNA sequencing, Polymerase Chain Reaction (PCR), and drug discovery and development. Conventional Drug discovery procedures require timely and costly manned experiments with a high degree of human errors with no guarantee of success. On the other hand, DMFB can be a great solution for miniaturization, int...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Vehicular Technology

سال: 2017

ISSN: 0018-9545,1939-9359

DOI: 10.1109/tvt.2017.2690238