Virgo status and commissioning results

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Commissioning status of the Virgo interferometer

The Virgo interferometer is one of the big observatories aimed at detecting gravitational waves. This report will describe the Virgo+ upgrades and the commissioning work performed between the first (VSR1) and the second Virgo Science Run (VSR2). Some first results of VSR2 will be discussed, which was recently started with a good duty cycle and a inspiral range for the detection of binary neutro...

متن کامل

Status and Commissioning-results of Bessy Ii

The new Storage Ring BESSY II in Berlin Germany is a dedicated third generation synchrotron radiation source for the VUV and soft X-ray spectral range [1]. On April 22, 1998 a 1.7 GeV electron beam was stored for the first time. Despite a relatively short time for commissioning of the synchrotron radiation source, the milestones were met as scheduled. Accelerator parameters that determine the q...

متن کامل

Status of the CMS Silicon Strip Tracker and Commissioning Results

The main subsystems of the CMS Tracker have been assembled together in a dedicated large clean room at CERN, prior to the installation in CMS. Following the integration of the Tracker a long commissioning period took place, during which, up to 15% of the silicon modules were operated and read out simultaneously at different temperatures. Some of the achievements of this commissioning phase are ...

متن کامل

The APS SASE FEL: STATUS AND COMMISSIONING RESULTS

A self-amplified spontaneous emission (SASE) freeelectron laser (FEL) is under construction at the Advanced Photon Source (APS). Three gun systems, an rf-test area, laser room, numerous diagnostics, a transfer line at the end of the linac, and a new building, which will serve as the experimental hall, have been added. The only remaining items to be installed are the undulators into the beamline...

متن کامل

The Status of Virgo

The commissioning phase of the fullVirgo gravity-wave interferometric detector started in September 2003, and is still progressing. This activity is intended to achieve a stable operation of the detector, at its design strain sensitivity, in the frequency bandwidth extending from about 10 Hz up to a few kHz, with a value of a few 10−23 around 500 Hz. In October 2004 the interferometer was locke...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Classical and Quantum Gravity

سال: 2005

ISSN: 0264-9381,1361-6382

DOI: 10.1088/0264-9381/22/10/008