Wind Tunnel Test of the Akashi Kaikyo Bridge using Full Bridge Model

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Development of Average Model for Control of a Full Bridge PWM DC-DC Converter

This paper presents a detailed small-signal and transient analysis of a full bridge PWM DC-DC converter designed for high voltage, high power applications using an average model. The derived model is implemented in a typical system and used to produce the small-signal and transient characteristics of the converter. Results obtained in the analysis of the high voltage and high power design examp...

متن کامل

the use of appropriate madm model for ranking the vendors of mci equipments using fuzzy approach

abstract nowadays, the science of decision making has been paid to more attention due to the complexity of the problems of suppliers selection. as known, one of the efficient tools in economic and human resources development is the extension of communication networks in developing countries. so, the proper selection of suppliers of tc equipments is of concern very much. in this study, a ...

15 صفحه اول

scour modeling piles of kambuzia industrial city bridge using hec-ras and artificial neural network

today, scouring is one of the important topics in the river and coastal engineering so that the most destruction in the bridges is occurred due to this phenomenon. whereas the bridges are assumed as the most important connecting structures in the communications roads in the country and their importance is doubled while floodwater, thus exact design and maintenance thereof is very crucial. f...

Tunnel Leveling, Depth, and Bridge Numbers

We use the theory of tunnel number 1 knots introduced in an earlier paper to strengthen the Tunnel Leveling Theorem of Goda, Scharlemann, and Thompson. This yields considerable information about bridge numbers of tunnel number 1 knots. In particular, we calculate the minimum bridge number of a knot as a function of the maximum depth invariant d of its tunnels. The growth of this value is on the...

متن کامل

Load Test and Model Calibration of a Horizontally Curved Steel Box-Girder Bridge

In this paper, full scale load test of a horizontally curved steel box-girder bridge is carried out in order to detect structural defects, which reportedly result in unwanted vibrations in nearby buildings. The bridge is tested under the passage of six heavy vehicles at different speeds, so as to determine its static and dynamic responses. A total number of one hundred and two (102) sensors are...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Wind Engineers, JAWE

سال: 1996

ISSN: 1883-8413,0912-1935

DOI: 10.5359/jawe.1996.68_25