Requirements for an Electricity Trading Infrastructure in a Small Deregulated Hydro-system
نویسنده
چکیده
The paper discusses roles, issues and possible conflicts concerning the electricity trading infrastructure of a small hydro-system, such as that of Iceland. Some critical elements of successfully implementing the infrastructure are discussed. In particular, the metering and settlement (M&S) systems are discussed and the arguments for an single independent M&S entity are provided. Furthermore, the case of Iceland provides an example for analyzing implementation and design issues with the deregulation process in a small isolated hydrobased power system. The paper discusses those issues. The separation of monopolistic and competitive parts of the deregulated environment is well known. The paper discusses the need for a similar separation between actors and entities with supportive or regulatory roles. The main conclusions are that the M&S entity needs to be an independent organization in a similar way as an independent ISO although the functions of an ISO are of different nature. In addition, codes, design documents, regulations and further research is needed as a foundation before initiating deregulation under conditions in a small isolated power system.
منابع مشابه
A New Approach for Accurate Pricing of Reactive Power and Its Application to Cost Allocation in Deregulated Electricity Markets
Reactive power management plays an essential role in the secure operation of the power system as an ancillary service. Although in electricity markets, the particular attention is paid to active power, the reactive power also plays an important on total generation costs of electricity. On the other hand, as it is mainly confined to local consumption, to avoid market power and maintain the se...
متن کاملSmall Hydro-Power Plants in Kenya: A Review of Status, Challenges and Future Prospects
Small Hydro-power Plants (SHP) are an important source of electricity in many countries. However, little is known about SHP in Kenya. This paper reviews the status, challenges in implementation of SHP and prospects for future development of SHP in Kenya. The paper shows that SHP has not yet fully utilized the available hydro-power potential. The challenges associated with SHP development should...
متن کاملStochastic Unit Commitment in Hydro-Thermal Power Production Planning
Economic needs and the ongoing liberalization of European electricity markets stimulate the interest of power utilities in developing models and optimization techniques for the generation and trading of electric power under uncertainty. Utilities participating in deregulated markets observe increasing uncertainty in load (i.e., demand for electric power) and prices for fuel and electricity on s...
متن کاملTransmission Network Congestion in Deregulated Wholesale Electricity Market
Electricity market plays an important role in improving the economics of electrical power system. Transmission network is vital entity in open access deregulated wholesale electricity market. Whenever transmission network congestion occurs in electricity market, it divides the market in different zones and the trading price of electricity will no longer remains the same for the whole system. Bi...
متن کاملFailure Mode and Effect Analysis Power Plant Boiler
The current electricity demand is increasing, and now the government has involved third parties in the implementation of electricity so that investors compete in building infrastructure in order to apply electricity. Thermal power is one source that has a fast break event point compared to other resources that more interested investors even with all forms of pollution caused. A form of heat pow...