A common method used to reduce project delivery time is to overlap sequential activities. Evolution and sensitivity characterizations of design activities provide a practical tool for identifying overlapping opportunities. The faster the evolution of information in an activity, the less risky it is to begin a downstream activity before the upstream activity is finalized. Also, the lower the sensitivity to changes in upstream information, the less risky it is to overlap activities. A methodology for determining the evolution and sensitivity of design activities has been developed through a series of expert interviews. The evolution of an activity can be determined by evaluating the levels of design optimization, constraint satisfaction, external information exchange, and standardization. The sensitivity of an activity can be determined by evaluating activity constraints, input variables, and the level of design integration. This framework for characterizing design activities in terms of evolution and sensitivity will lead to significant reductions in project delivery times. DOI: 10.1061/ ASCE 0733-9364 2005 131:11 1179 CE Database subject headings: Project management; Fast track construction; Construction industry; Building design; Delivery.
منابع مشابه
Incorporating probabilistic model of customers’ preferences in concurrent engineering
Concurrent engineering has been generally accepted as an important approach to reduce time to market. For years, the focus of concurrency has been design and manufacturing. With customers’ inputs becoming more crucial for product development, incorporating customers’ preferences into the design process has become significant in the continuing quest for reducing time to market. Because customers...
متن کاملA Maturity Concurrent Engineering Best Practice in Improving Supply Chains
General Engineer-to-Order (ETO) design of product capacity projects among many others, includes design for large electric machine, huge centrifugal pumps, diesel/natural fuel power plant engines, steam turbine, boiler, ship power, et cetera. ETO is basically a product development process, which starts with a product specification and finishes with an engineering design as its deliverable. It ra...
متن کاملTurbine Blade Investment Casting Cost Estimating Model (TECHNICAL NOTES)
The objective of this research is to develop a turbine blade investment casting cost advisor model to assist a blade designer in decision-making in a concurrent engineering environment. It is a microcomputer based cost estimating system that employs a manufacturing knowledge base. The concept of the manufacturing process for blade production by the investment casting method is used to develop t...
متن کاملA Continuous Verification Process in Concurrent Engineering
This paper presents how a continuous mission verification process similar than in software engineering can be applied in early spacecraft design and Concurrent Engineering. Following the Model-based Systems Engineering paradigm, all engineers contribute to one single centralized data model of the system. The data model is enriched with some extra information to create an executable representati...
متن کاملConcurrent Engineering : an Effective Engineering Management Strategy
The paper provides a comprehensive insight into current trends and developments in Concurrent Engineering for integrated development of products and processes with the goal of completing the entire cycle in a shorter time, at lower overall cost and with fewer engineering design changes after product launch. The evolution and definition of Concurrent Engineering are addressed first, followed by ...