Decision Support Tool for Projects Portfolio Prototyping

نویسندگان

  • Grzegorz BOCEWICZ
  • Irena BACH
  • Zbigniew BANASZAK
چکیده

Constraint Programming (CP) is an emergent software technology for declarative description and effective solving of large combinatorial problems especially in the area of projects portfolio prototyping. The paper deals with multi-resource and multi-criteria problem in which more than one shared renewable resource type may be required by manufacturing operation and the availability of each type is time-windows limited. The problem belongs to a class of NP-complete ones. The aim of the paper is to present a knowledge based and CP-driven approach to resource allocation conflicts resolution framework. Proposed framework stands behind a methodology aimed at task oriented DSS tolls designing. The Portfolio Project Prototyping System designed due to this methodology provides a prompt and interactive service to a set of routine queries stated both in straight and reverse way. Multiple illustrative examples are discussed. 1. INTERACTIVE TASK ORIENTED DECISION SUPPORT TOOLS Some industrial processes simultaneously produce different products using the same production resources. An optimal assignment of available resources to production steps in a multi-product job shop is often economically indispensable. The goal is to generate a plan/schedule of production orders for a given period of time while minimizing the cost that is equivalent to maximization of profit. In that context executives want to know how much a particular production order will cost, what resources are needed, what resources allocation can guarantee due time production order completion, and so on. So, a manager’s needs might be formulated in a form of standard, routine questions, such as: Does the production order can be completed before an arbitrary given deadline? What is the production completion time following assumed robots operation time? Is it possible to undertake a new production order under given (constrained in time) resources availability while guaranteeing disturbance-free execution of the already executed orders? What values and of what variables guarantee the production order will completed following assumed set of performance indexes? The problems standing behind of the quoted questions belong to the class of so called project scheduling ones. In turn, project scheduling can be defined as the process of allocating 1 Koszalin University of Technology, Dept. of Computer Science and Management ul. Śniadeckich 2, 75354 Koszalin, Poland, [email protected]

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Constraint Programming Approach to Time-Window and Multiresource-Constrained Projects Portfolio Prototyping

Constraint Programming (CP) is an emergent software technology for declarative description and effective solving of large combinatorial problems especially in the area of integrated production planning. In that context, CP can be considered as an appropriate framework for development of decision making software supporting small and medium sized enterprises (SMEs) in the course of projects portf...

متن کامل

V3pm: a Decision Support Tool for Value-based Process Project portfolio Management

In the context of Business Process Management (BPM), organizations strive to develop their BPM capabilitiy and to improve their individual business processes in an integrated manner. Planning models assist in selecting and ordering implementable BPMand process-level projects maximizing the firm value, catering for the projects’ effects on process performance and for interactions among projects....

متن کامل

A Strategic Decision Support System for Electric Utility Companies – an Analysis Tool for Projects Portfolio Management

This paper describes an expert system (ES) based decision support system (DSS), which aids the user to select feasible projects among a strategic portfolio supplied by a dynamic simulator (DS). The ES incorporates the ALTMAN model for predicting financial distress. This model is utilized for aiding the user to find the most feasible values for the financialeconomic parameters, managing the proj...

متن کامل

Using Analytic Hierarchy Process as a Decision-Making Tool in Project Portfolio Management

Project Portfolio Management (PPM) is an essential component of an organisation’s strategic procedures, which requires attention of several factors to envisage a range of long-term outcomes to support strategic project portfolio decisions. To evaluate overall efficiency at the portfolio level, it is essential to identify the functionality of specific projects as well as to aggregate those findi...

متن کامل

Investment Decision-Making about Portfolio of Technology Development Projects; Based on the Analysis of Success Criteria using Fuzzy Neural Network and MADM

Technology development project is a type of investment project and it is important to identify the performance indicators and planning for the correct investment. The purpose of this research is the development of indicators of portfolio success, accurate analysis of the effects of indicators on each other and the achievement of a proper investment model. In this research, the success criteria ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013