Quality Based Software Project Staffing and Scheduling with Budget and Deadline

نویسندگان

  • Dongwon Seo
  • Donghwan Shin
  • Doo-Hwan Bae
چکیده

Software project planning is becoming more complicated and important as the size of software project grows. Many approaches have been proposed to help project managers by providing optimal staffing and scheduling in terms of minimizing the salary cost or duration. Unfortunately, the software quality, another critical factor in software project planning, is largely overlooked in previous work. In this paper, we propose the quality based software project staffing and scheduling approach. We provide better software project plans considering quality with either cost bound (Budget) or duration bound (Deadline) for software project managers.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Investigation of Optimal Project Scheduling and Team Staffing in Software Development using Particle Swarm Optimization

Software development organizations often struggle to deliver projects on time, within budget and with the required quality. One possible cause of this problem is poor software project management and, in particular, inadequate project scheduling and ineffective team staffing. This paper investigates the application of a particle swarm optimization algorithm to help software project managers perf...

متن کامل

Intelligent Software Project Scheduling and Team Staffing with Genetic Algorithms

Software development organisations are under heavy pressure to complete projects on time, within budget and with the appropriate level of quality, and many questions are asked when a project fails to meet any or all of these requirements. Over the years, much research effort has been spent to find ways to mitigate these failures, the reasons of which come from both within and outside the organi...

متن کامل

Scheduling scientific workflow applications with deadline and budget constraints using genetic algorithms

Grid technologies have progressed towards a service-oriented paradigm that enables a new way of service provisioning based on utility computing models, which are capable of supporting diverse computing services. It facilitates scientific applications to take advantage of computing resources distributed world wide to enhance the capability and performance. Many scientific applications in areas s...

متن کامل

Developing Robust Project Scheduling Methods for Uncertain Parameters

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

متن کامل

AN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK

Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015