We study an unrelated parallel machines scheduling problem with sequence and machine dependent setup times. A logicbased Benders decomposition approach is proposed to minimize the makespan. The decomposition approach is a hybrid model that makes use of a mixed integer programming master problem and a travelling salesman problem subproblem. The master problem is a relaxation of the problem and is used to create assignments of jobs to machines, while the subproblem obtains optimal schedules based on the master problem assignments. Computational results comparing the Benders decomposition and mixed integer program formulation show that the Benders model is able to find optimal solutions to problems up to five orders of magnitude faster as well as solving problems four times the size possible previously.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Logic-based Benders Decomposition for Alternative Resource Scheduling with Sequence Dependent Setups

We study an unrelated parallel machines scheduling problem with sequence and machine dependent setup times. A logicbased Benders decomposition approach is proposed to minimize the makespan. This approach is a hybrid model that makes use of a mixed integer programming master problem and a specialized solver for travelling salesman subproblems. The master problem is used to assign jobs to machine...

متن کامل

A fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times

This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the o...

متن کامل

A New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm

This paper presents a novel, integer-linear programming (ILP) model for an identical parallel-machine scheduling problem with family setup times that minimizes the total weighted flow time (TWFT). Some researchers have addressed parallel-machine scheduling problems in the literature over the last three decades. However, the existing studies have been limited to the research of independent jobs,...

متن کامل

Optimum Aggregate Inventory for Scheduling Multi-product Single Machine System with Zero Setup Time

In this paper we adopt the common cycle approach to economic lot scheduling problem and minimize the maximum aggregate inventory. We allow the occurrence of the idle times between any two consecutive products and consider limited capital for investment in inventory. We assume the setup times are negligible. To achieve the optimal investment in inventory we first find the idle times which minimi...

متن کامل

Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times

This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011