Final Report on Assessment Instruments for a Prospective Payment System

نویسندگان

  • Joan L. Buchanan
  • Patricia Andres
  • Stephen M. Haley
  • Susan M. Paddock
  • David C. Young
  • Alan Zaslavsky
چکیده

R The RAND Corporation is a nonprofit research organization providing objective analysis and effective solutions that address the challenges facing the public and private sectors around the world. RAND's publications do not necessarily reflect the opinions of its research clients and sponsors. All rights reserved. No part of this book may be reproduced in any form by any electronic or mechanical means (including photocopying, recording, or information storage and retrieval) without permission in writing from RAND. A profile of RAND Health, abstracts of its publications, and ordering information can be found on the RAND Health home page at www.rand.org/health. Preface The Balanced Budget Act of 1997 mandated the implementation of a prospective payment system for inpatient rehabilitation. The Health Care Financing Administration (now the Centers for Medicare and Medicaid Services) issued a which described the design of the rehabilitation prospective payment system (PPS) and reflected their desire to substitute a new, broader, multipurpose data collection instrument, the Minimum Data Set—Post-Acute Care, for the original Functional Independence Measure. This study assesses the potential implications of making this substitution on patient classification and facility payment. The appendices to this report are published in a separate volume as J. L. and others to support RAND and the Centers for Medicare and Medicaid Services in their efforts to design and implement a prospective payment system for inpatient rehabilitation. The role of each organization is described below. Harvard Medical School had responsibility for the project design, its implementation, analysis, and the preparation of the final report. provided the rehabilitation expertise for the development and preparation of training materials, hired the calibration teams, supervised their training, and conducted the certification process for both the calibration teams and the institutional-based data collection teams. They were responsible for hiring the field core coordinator who oversaw the entire field operation. They also participated in the analytic phase of the project. RAND was the prime contractor providing both overall guidance and some of the analytic support to the project, particularly for the factor analysis. Hebrew Rehabilitation Center for the Aged conducted the train the trainers program on the MDS-PAC and ran a regular MDS-PAC training program for our calibration teams. They also provided expert consultation to the field coordinator and the study team on questions with the MDS-PAC. Uniform Data System for Medical Rehabilitation provided trainers and conducted 10 training sessions across the country on the MDS-PAC for our institutional …

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Medicare program; prospective payment system and consolidated billing for skilled nursing facilities for FY 2015. Final rule.

This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs) for fiscal year (FY) 2015. In addition, it adopts the most recent Office of Management and Budget (OMB) statistical area delineations to identify a facility's urban or rural status for the purpose of determining which set of rate tables will apply to the facility, and ...

متن کامل

Medicare Program: Hospital Outpatient Prospective Payment and Ambulatory Surgical Center Payment Systems and Quality Reporting Programs. Final rule with comment period.

This final rule with comment period revises the Medicare hospital outpatient prospective payment system (OPPS) and the Medicare ambulatory surgical center (ASC) payment system for CY 2018 to implement changes arising from our continuing experience with these systems. In this final rule with comment period, we describe the changes to the amounts and factors used to determine the payment rates fo...

متن کامل

Medicare program; end-stage renal disease prospective payment system, quality incentive program, and bad debt reductions for all Medicare providers. Final rule.

This final rule updates and makes revisions to the end-stage renal disease (ESRD) prospective payment system (PPS) for calendar year (CY) 2013. This rule also sets forth requirements for the ESRD quality incentive program (QIP), including for payment year (PY) 2015 and beyond. In addition, this rule implements changes to bad debt reimbursement for all Medicare providers, suppliers, and other en...

متن کامل

Executive Summary of Analyses for the Initial Implementation of the Inpatient Rehabilitation Facility Prospective Payment System

Approved for public release; distribution unlimited R-iii-PREFACE This report describes the research that RAND performed to support the efforts of the Health Care Financing Administration (HCFA) to design, develop, and implement a Prospective Payment System (PPS) for inpatient rehabilitation. It presents recommendations concerning the payment system and also discusses our plans for further rese...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004