Finding minimum cost to time ratio cycles with small integral transit times

نویسندگان

  • Mark Hartmann
  • James B. Orlin
چکیده

Let D = (V, E) be a digraph with n vertices and m arcs. For each e E E there is an associated cost ce and a transit time te; Ce can be arbitrary, but we require t to be a non-negative integer. The cost to time ratio of a cycle C is X(C) = 3 ec ceCeec t. Let E' c E denote the set of arcs e with te > 0, let T = max{tv: (u, v) E} for each vertex u, and let T = uev T. We give a new algorithm for finding a cycle C with the minimum cost to time ratio X(C). The algorithm's (T(m + n log n)) running time is dominated by O(T) shortest paths calculations on a digraph with non-negative arc lengths. Further, we consider early termination of the algorithm and a faster O(Tm) algorithm in case E E' is acyclic, i.e., in case each cycle has a strictly positive transit time, which gives an O(n ) algorithm for a class of cyclic staffing problems considered by Bartholdi et al. The algorithm can be seen to be an extension of the O(nm) algorithm of Karp for the case in which t = 1 for all e E E, which is the problem of calculating a minimum mean cycle. Our algorithm can also be modified to solve the related parametric shortest paths problem in O(T(m + n log n)) time. © 1993 by John Wiley & Sons, Inc.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Algorithm for Monitoring Minimum Cost in Fuzzy Dynamic Networks

The present paper examines the task of minimum cost flow finding in a fuzzy dynamic network with lower flow bounds. The distinguishing feature of this problem statement lies in the fuzzy nature of the network parameters, such as flow bounds, transmission costs and transit times. The arcs of the considered network have lower bounds. Another feature of this task is that fuzzy flow bounds, costs a...

متن کامل

Scheduling Accumulated Rework in a Normal Cycle: Optimal Batch Production with Minimum Rework Cycles

In this paper we consider a single machine system that produces items part of which are defective. The defective items produced in a time period, consisting of several equal cycles, are accumulated and are all reworked in the last cycle of this period called the rework cycle. At the end of the rework cycle the whole process will start all over again. The first significant objective of this stud...

متن کامل

Minimum Cost Multicommodity Flows in Dynamic Networks and Algorithms for their Finding

We consider the minimum cost multicommodity flow problem in dynamic networks with time-varying capacities of arcs and transit times on arcs that depend on the sort of commodity entering them. We assume that cost functions, defined on arcs, are nonlinear and depend on time and flow, and the demand function also depends on time. Moreover, we study the problem in the case when transit time functio...

متن کامل

Minimum Convex Cost Dynamic Network Flows

This paper presents and solves in polynomial time the minimum convex cost dynamic network flow problem, an infinite horizon integer programming problem which involves network flows evolving over time. The model is a finite network in which each arc has an associated transit time for flow to pass through it. An integral amount of flow is to be sent through arcs of the network in each period over...

متن کامل

Calculation of 99mTc-DTPA transit times in normal kidney [Persian]

Introduction: Renal dynamic study is a well-established and popular test in routine practice of nuclear medicine. The test is non-invasive, rapid and unique in evaluation of the kidney function. In despite of its clinical values, the parameters derived from renogram are physiologically meaningless. That is due to the fact that renogram is not the true kidney function. From mathematical po...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Networks

دوره 23  شماره 

صفحات  -

تاریخ انتشار 1993