Customer Order Scheduling to Minimize Total Weighted Completion Time
نویسندگان
چکیده
In this paper we study the scheduling problem in which each customer order consists of several jobs of different types, which are to be processed on m facilities. Each facility is dedicated to the processing of only one type of jobs. All jobs of an order have to be delivered to the customer at the same time. The objective is to schedule all the orders to minimize the total weighted order completion time. While the problem has been shown to be unary NP-hard, we develop a heuristics to tackle the problem and analyze its worst-case performance.
منابع مشابه
An Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time
This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other exist...
متن کاملCustomer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop
This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...
متن کاملA Multi-Objective Particle Swarm Optimization Algorithm for a Possibilistic Open Shop Problem to Minimize Weighted Mean Tardiness and Weighted Mean Completion Times
We consider an open shop scheduling problem. At first, a bi-objective possibilistic mixed-integer programming formulation is developed. The inherent uncertainty in processing times and due dates as fuzzy parameters, machine-dependent setup times and removal times are the special features of this model. The considered bi-objectives are to minimize the weighted mean tardiness and weighted mean co...
متن کاملIs a Unit - Time Job Shop Not Easierthan
This paper gives the positive answer to the question posed in the title for a wide class of minimization criteria including the maximum completion time, maximum lateness , total completion time, total weighted completion time, total tardiness, total weighted tardiness, number of late jobs and the weighted number of late jobs. That is any scheduling problem for m identical parallel machines to m...
متن کاملScheduling Hemodialysis Patients with Patient Preferences
Nowadays, outpatient providers are struggling to reduce the current costs and improve the service quality. A part of the outpatient service provider is a hemodialysis department with expensive supplies and equipment. Therefore, in the present paper, the scheduling of hemodialysis patients with their preferences has been studied. The aim of scheduling hemodialysis patients in this study is to mi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2005