Valuing modular nuclear power plants in finite time decision horizon

نویسندگان

  • Shashi Jain
  • Ferry Roelofs
  • Cornelis W. Oosterlee
چکیده

Article history: Received 7 May 2012 Received in revised form 6 November 2012 Accepted 9 November 2012 Available online 17 November 2012 JEL classification: D81 Q40 G11

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal Investment in Modular Reactors in a Finite Time Decision Horizon

Small and Medium sized reactors (according to IAEA, ’small’ are reactors with power less than 300 MWe, and ’medium’ with power less than 700 MWe) are considered as an attractive option for investment in nuclear power plants. SMRs may benefit from flexibility of investment, reduced upfront expenditure, enhanced safety, and easy integration with small sized grids. Large reactors on the other hand...

متن کامل

Optimal Preventive Maintenance under Decision Dependent Uncertainty

We analyze a system of N components with dependent failure times. The goal is to obtain the optimal block replacement interval (different for each component) over a finite horizon that minimizes the expected total maintenance cost. In addition, we allow each preventive maintenance action to change the future joint failure time distribution. We illustrate our methodology with an example from Sou...

متن کامل

Countering Security Risks to Nuclear Power Plants

Between 1972 and 2007 altogether 17 major terror attacks or acts of sabotage have been carried against nuclear power plants (NPP). None of them resulted in an uncontrolled radioactive release. In order to reduce the security risk to NPP due to terrorists in the future, preemptive measures are necessary to identify their motivation, incentives, operational and logistical capabilities to implemen...

متن کامل

Using Probabilistic Analysis to Value Power Generation Investments under Uncertainty

This paper reviews the limits of the traditional ‘levelised cost’ approach to properly take into account risks and uncertainties when valuing different power generation technologies. We introduce a probabilistic valuation model of investment in three base-load technologies (combined cycle gas turbine, coal plant, and nuclear power plant), and demonstrate using three case studies how such a prob...

متن کامل

A Parallel Manipulation Method for Zero-suppressed Binary Decision Diagram

A parallel algorithm for the manipulation of Zero-suppressed Binary Decision Diagrams (ZBDDs) on a shared memory multi-processor system was described. Theoretical analysis showed that parallel manipulation of ZBDD has a better time performance than the sequential operation of ZBDD. Since the parallel ZBDD algorithm uses much less time than the ordinary ZBDD algorithm, a real-time calculation ca...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013