Robotic cell scheduling with operational flexibility

نویسندگان

  • M. Selim Akturk
  • Hakan Gultekin
  • Oya Ekin Karasan
چکیده

In this paper, we study the problem of two-machine, identical parts robotic cell scheduling with operational $exibility. We assume that every part to be processed has a number of operations to be completed in these two machines and both machines are capable of performing all of the operations. The decision to be made includes 8nding the optimal robot move cycle and the corresponding optimal allocation of operations to these two machines that jointly minimize the cycle time. We prove that with this de8nition of the problem 1-unit robot move cycles are no longer necessarily optimal and that according to the given parameters either one of the 1-unit robot move cycles or a 2-unit robot move cycle is optimal. The regions of optimality are presented. c © 2004 Elsevier B.V. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling in robotic cells: process flexibility and cell layout

The focus of this study is the identical parts robotic cell scheduling problem with m machines under the assumption of process and operational flexibility. A direct consequence of this assumption is a new robot move cycle that has been overlooked in the existing literature. We prove that this new cycle dominates all classical robot move cycles considered in the literature for m1⁄4 2. We also pr...

متن کامل

A New Solution for the Cyclic Multiple-Part Type Three-Machine Robotic Cell Problem based on the Particle Swarm Meta-heuristic

In this paper, we develop a new mathematical model for a cyclic multiple-part type threemachine robotic cell problem. In this robotic cell a robot is used for material handling. The objective is finding a part sequence to minimize the cycle time (i.e.; maximize the throughput) with assumption of known robot movement. The developed model is based on Petri nets and provides a new method to calcul...

متن کامل

بهینه سازی هزینه کل تولید و زمان در سلول رباتیک سه ماشین

In this research, robotic cell scheduling problem with three CNC machines and with an operation on each machine with the purpose of optimizing manufacturing cost and time in S1 cycle has been investigated. To obtain the optimal total cost of production has been used the optimal processing time on machine operation. In this research, robotic cell scheduling is studied in three different situatio...

متن کامل

Scheduling in a three-machine robotic flexible manufacturing cell

In this study, we consider a flexible manufacturing cell (FMC) processing identical parts on which the loading and unloading of machines are made by a robot. The machines used in FMCs are predominantly CNC machines and these machines are flexible enough for performing several operations provided that the required tools are stored in their tool magazines. Traditional research in this area consid...

متن کامل

حل مسأله زمان‌بندی کار کارگاهی چندهدفی انعطاف‌پذیرِ پویا به وسیله الگوریتم ژنتیک توسعه‌یافته

In this paper, Multi-Objective Flexible Job-Shop scheduling with Parallel Machines in Dynamic manufacturing environment (MO-FDJSPM) is investigated. Moreover considering dynamical job-shop environment (jobs arrived in non-zero time), It contains two kinds of flexibility which is effective for improving operational manufacturing systems. The non-flexibility leads to scheduling program which have...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Discrete Applied Mathematics

دوره 145  شماره 

صفحات  -

تاریخ انتشار 2005