Ion-source and LEBT Issues with the Front-End Systems for the Spallation Neutron Source*
نویسندگان
چکیده
The Front-End Systems (FES) of the Spallation Neutron Source (SNS) project are being built by Berkeley Lab and will deliver a pulsed 40-mA H ion beam at 2.5 MeV energy to the subsequent Drift-Tube Linac. The FES accelerator components comprise an rf driven, volume-production, cesium-enhanced, multi-cusp Ion Source; an electrostatic Low-Energy Beam Transport (LEBT) that includes provisions for transverse focusing, steering, and beam chopping; an RFQ accelerator; and a Medium-Energy Beam Transport (MEBT) line. The challenges for Ion Source and LEBT design are the generation of a plasma suitable for creating the required high H ion density, lifetime of the rf antenna at 6% duty factor, removal of the parasitic electron population from the extracted negative ions, and emittance conservation. The paper discusses these issues in detail and highlights key experimental results obtained so far. *This work is supported by the Director, Office of Science, Office of Basic Energy Sciences, of the U.S. Department of Energy under Contract No. DE-AC03-76SF00098.
منابع مشابه
Status of the Fets Project
The Front End Test Stand (FETS) under construction at RAL is a demonstrator for front end systems of a future high power proton linac. Possible applications include a linac upgrade for the ISIS spallation neutron source, new future neutron sources, accelerator driven sub-critical systems, high energy physics proton drivers etc. Designed to deliver a 60mA H-minus beam at 3MeV with a 10% duty fac...
متن کاملPerformance of the Low Energy Beam Transport at the Ral Front End Test Stand
The Front End Test Stand (FETS) at the Rutherford Appleton Laboratory (RAL) is intended to demonstrate the early stages of acceleration (up to 3MeV) and beam chopping required for high power proton accelerators, including proton drivers for pulsed neutron spallation sources and neutrino factories. A Low Energy Beam Transport (LEBT), consisting of three solenoids and four drift sections, is used...
متن کاملCommissioning of the Low Energy Beam Transport
The Front End Test Stand (FETS) at the Rutherford Appleton Laboratory is intended to demonstrate the early stages of acceleration (0-3 MeV) and beam chopping required for high power proton accelerators, including proton drivers for pulsed neutron spallation sources and neutrino factories. A Low Energy Beam Transport (LEBT), consisting of three solenoids and four drift sections, is used to trans...
متن کاملPlans for a Collaboratively Developed Distributed Control System for the Spallation Neutron Source **
The Spallation Neutron Source (SNS) is an acceleratorbased pulsed neutron source to be built in Oak Ridge, Tennessee [1]. The facility has five major sections a "front end" consisting of a 65 kev H ion source followed by a 2.5 MeV RFQ; a 1 GeV linac; a storage ring; a 1MW spallation neutron target (upgradeable to 2 MW); the conventional facilities to support these machines and a suite of neutro...
متن کاملDistributed Implementation Plan for a Large, Distributed Accelerator Control System
The proposed Spallation Neutron Source (SNS) is an accelerator-based 1 – 2 MW pulsed neutron source to be built in Oak Ridge, Tennessee. The facility has five major sectionsó a "front end" consisting of a 65 Kev H ion source followed by a 2.5 MeV RFQ; a 1 GeV linac; a storage ring; a 1 MW spallation neutron target; and the conventional facilities to support these machines. These components will...