Sequential Plans and Risk Evaluation
نویسنده
چکیده
Introduced in 1990s, sequential plans generalize and optimize the classical sequential procedures allowing sampling in groups of variables sizes. Sequential plans are preferred to pure sequential procedures when the cost function is non-linear so that each observed group implies an additional fixed cost. Optimal plans minimize the risk, a weighted sum of the expected loss, cost of observations, and cost of groups. Although risk evaluation is a challenging problem in sequential planning, risk functions of sequentially planned probability ratio tests (SPPRT) can be obtained as roots of certain functional equations. Explicit solutions are derived for SPPRT on a lattice, allowing practitioners to compare exact risks and choose an optimal procedure.
منابع مشابه
Principles of Optimal Sequential Planning
A concept of sequential planning is presented as extension and generalization of “pure” sequential procedures. According to it, observations are collected in groups of variable sizes. The article discusses optimality of sequential plans in terms of a suitable risk function that balances an observation cost and a group cost. It is shown that only non-randomized sequential plans based on a suffic...
متن کاملRisk of Sequential Estimator of the Failure Rate of Exponential Distribution under Convex Boundary
In this paper the exact determination of the distribution of stopping variable, the moment and risk of sequential estimator of the failure rate of exponential distribution, under convex boundary is obtained. The corresponding Poisson Process is used to derive the exact distribution of stopping variable of sequential estimator of the failure rate. In the end the exact values of mean and risk ...
متن کاملAnalyzing the effect of ore grade uncertainty in open pit mine planning; A case study of Rezvan iron mine, Iran
Due to uncertain nature of grade in ore deposits, considering uncertainty is inevitable in geological modelling of resources and mine planning. In other words, uncertainty in grade of mineralized materials, is one of the most significant parameters need attention in mine planning. In this paper, a comparative procedure utilizing Sequential Gaussian Simulation (SGS) and traditional Ordinary Krig...
متن کاملProbabilistic evaluation of sequential plans from causal models with hidden variables
The paper concerns the probabilistic eval uation of plans in the presence of unmea sured variables, each plan consisting of sev eral concurrent or sequential actions. We establish a graphical criterion for recogniz ing when the effects of a given plan can be predicted from passive observations on measured variables only. When the crite rion is satisfied, a closed-form expression is provide...
متن کاملAssessment of the distribution, bioavailability and ecological risk assessment of heavy metals in the coastal sediments of Qeshm Island (Hormozgan)
Sediment samples were collected from 8 sites in the northern areas of Qeshm Island, Iran to determine the total and partial concentrations of heavy metals including copper (Cu), lead (Pb), nickel (Ni), cadmium (Cd), and Iron (Fe), in February 2016. A combination of nitric acid and perchloric acid was used to determine the total concentrations and sequential extraction method was used to analyze...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2013