Yet Another Note on “An Efficient Zero-One Formulation of the Multilevel Lot-Sizing Problem”

نویسندگان

  • Michael R. Bussieck
  • Andreas Fink
  • Marco E. Lübbecke
چکیده

In “An Efficient Zero-One Formulation of the Multilevel Lot-Sizing Problem” [8] MCKNEW, SAYDAM, and COLEMAN claim the polynomial solvability of this particular production planning problem. Both, the proof given by MCKNEW et al. and a statement of its incorrectness by RAJAGOPALAN [10] contain errors, and the question remains whether the approach leads to a polyomial time algorithm. We show by means of an example that solving the linear program is not sufficient. Subject Areas: Materials Requirement Planning, Assembly Systems, Integer/Binary Program, and Computational Complexity INTRODUCTION In “An Efficient Zero-One Formulation of the Multilevel Lot-Sizing Problem” [8] MCKNEW, SAYDAM, and COLEMAN present a zero-one formulation for the solution of the following production planning problem: Given an assembly system of n items, instantaneous and uncapacitated production, and lead times of zero from one stage to the next, determine a production plan that minimizes the total setup and inventory holding cost over a planning horizon of T periods. The formulation presented in [8] is not flawless, however, has been corrected in [5]—for details check also the electronic source we provide at the end of this note. MCKNEW, SAYDAM, and COLEMAN assert that the polyhedron P defined by the given system of O n T 2 linear inequalities in O n T 2 variables is integral. RAJAGOPALAN [10] pointed out that the proof’s fundamental argument of total unimodularity of the corresponding coefficient matrix does not hold. Although his claim is true, since the manipulations of the coefficient matrix performed in [8] do not preserve total unimodularity, the given counterexample of RAJAGOPALAN contains an error. Numerical investigations of P using PORTA [3] helped us to identify valid counterexamples and reveal e.g. for a tiny example with n 2 and T 4 that about 10% of P’s vertices are fractional. Still, the possibility remained that—with respect to the objective function given in [8]—at

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Finite Horizon Economic Lot Scheduling in Flexible Flow Lines

This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...

متن کامل

Three Meta-heuristic Algorithms for the Single-item Capacitated Lot-sizing Problem (RESEARCH NOTE)

This paper proposes a mixed integer programming model for single-item capacitated lot-sizing problem with setup times, safety stock, demand shortages, outsourcing and inventory capacity. Due to the complexity of problem, three meta-heuristics algorithms named simulated annealing (SA), vibration damping optimization (VDO) and harmony search (HS) have been used to solve this model. Additionally, ...

متن کامل

A POLYNOMIAL TIME BRANCH AND BOUND ALGORITHM FOR THE SINGLE ITEM ECONOMIC LOT SIZING PROBLEM WITH ALL UNITS DISCOUNT AND RESALE

The purpose of this paper is to present a polynomial time algorithm which determines the lot sizes for purchase component in Material Requirement Planning (MRP) environments with deterministic time-phased demand with zero lead time. In this model, backlog is not permitted, the unit purchasing price is based on the all-units discount system and resale of the excess units is possible at the order...

متن کامل

A Basic Period Approach for Solving the Economic Lot and Delivery Scheduling in Flexible Flow Lines

In this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. Single supplier via a flexible flow line production system (FFL), produces several items and delivers them directly to an assembly facility. Based on basic period (BP) strategy, a new mixed zero-one nonlinear programming model has been develop...

متن کامل

A Comparative Study on Meta Heuristic Algorithms for Solving Multilevel Lot-Sizing Problems

Material requirements planning (MRP) is an old field but still now plays an important role in coordinating replenishment decision for materials/components of complex product structure. As the key part of MRP system, the multilevel lot-sizing (MLLS) problem concerns how to determine the lot sizes for producing/procuring multiple items at different levels with quantita‐ tive interdependences, so ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1998