Centralized Versus Decentralized Scheduling and Due Date Quotation in a Make-to-Order Supply Chain

نویسندگان

  • Philip Kaminsky
  • Onur Kaya
چکیده

Although there is a vast and growing amount of literature on supply chain coordination, the majority of this literature focuses on make-to-stock systems and performance measures built around service and inventory levels. On the other hand, an increasing number of supply chains are better characterized as make-to-order systems. Fast and on-time delivery is obviously critical for any firm that operates as a make-to-order system, and the manufacturersupplier relationship dramatically impacts the delivery of products and system performance. In this research, we analyze such a make-to-order system in a supply chain setting and develop algorithms for scheduling and due-date quotation in both centralized and decentralized versions of this system. We also explore the value of information sharing in this setting. We consider a manufacturer with a single supplier that has to quote due dates to arriving customers in a make-to-order production environment. The manufacturer is penalized for long lead times, and for missing due dates. In order to meet due dates, the manufacturer has to obtain components from the supplier. As in most single facility due date quotation models (see Kaminsky and Hochbaum [1] for a survey), the manufacturer’s objective is to determine a schedule and quote due dates in order to minimize a function of quoted lead time length and lateness. We consider several variations of this problem, and design effective due-date quotation and scheduling rules for centralized and decentralized versions of the model. We also investigate the relative advantage of a centralized system under various conditions. In our model, customer orders i, i = 1, 2, ..., n arrive at the manufacturer at time ri which is not known in advance, and the manufacturer quotes each customer a due date di at the arrival of the order. To complete the processing and to deliver the product to the customer, the manufacturer needs some materials from the supplier and orders these materials from

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling and Due-Date Quotation in a Make-to-Order Supply Chain

We consider a manufacturer, served by a single supplier, who has to quote due dates to arriving customers in a maketo-order production environment. The manufacturer is penalized for long lead times and for missing due dates. To meet due dates, the manufacturer has to obtain components from a supplier. We model this manufacturer and supplier as a two-machine flow shop, consider several variation...

متن کامل

Scheduling and Due-Date Quotation in a MTO Supply Chain

We consider a manufacturer, served by a single supplier, who has to quote due dates to arriving customers in a maketo-order production environment. The manufacturer is penalized for long lead times and for missing due dates. To meet due dates, the manufacturer has to obtain components from a supplier. We model this manufacturer and supplier as a two-machine flow shop, consider several variation...

متن کامل

Order quantity optimization in a two-level pharmaceutical supply chain

Drug has a great and crucial role inboth the health systems and the quality of life, and thereforeits shortage can cause death.In order to the important role of drugs,pharmaceutical supply chain(PSC) shouldensure that drugs are delivered to people in the right time with the best quality.On the other hand, thesupply chain (SC) members depend on each other for resources and information, and it ha...

متن کامل

MTO-MTS Production Systems in Supply Chains

Increasing cost pressures have led supply chain managers to focus on running increasingly lean and efficient supply chains, with minimal inventory. Indeed, more and more firms are relying on pull or make-toorder (MTO) supply chains to minimize cost and waste. At the same time, increasing competitive pressures are leading to an increased emphasis on customer service. An important element of cust...

متن کامل

Combined make-to-order/make-to-stock supply chains

A multi-item manufacturer served by a single supplier in a stochastic environment is considered. The manufacturer and the supplier have to decide which items to produce to stock and which to produce to order. The manufacturer also has to quote due dates to arriving customers for make-to-order products. The manufacturer is penalized for long lead times, missing the quoted lead times and high inv...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005