Work Breakdown Structure: A Tool for Software Project Scope Verification
نویسنده
چکیده
Software project scope verification is a very important process in project scope management and it needs to be performed properly and thoroughly so as to avoid project rework and scope creep. Moreover, software scope verification is crucial in the process of delivering exactly what the customer requested and minimizing project scope changes. Well defined software scope eases the process of scope verification and contributes to project success. Furthermore, a deliverable-oriented WBS provides a road map to a well defined software scope of work. It is on the basis of this that this paper extends the use of deliverableoriented WBS to that of scope verification process. This paper argues that a deliverable-oriented WBS is a tool for software scope verification
منابع مشابه
The work breakdown structure in software project management
The work breakdown structure (WBS) is a vehicle for breaking an engineering project down into subproject, tasks, subtasks, work packages, and so on. It is an important planning tool which links objectives with resources and activities in a logical framework. It becomes an important status monitor during the actual implementation as the completions of subtasks are measured against the project pl...
متن کاملTowards anchoring software measures on elements of the process model
It is widely accepted that software measurement should be automated by proper tool support whenever possible and reasonable. While many tools exist that support automated measurement, most of them lack the possibility to reuse defined metrics and to conduct the measurement in a standardized way. This article presents an approach to anchor software measures on elements of the process model. This...
متن کاملModel Checking Software Product Lines
Dear Reader, This is the second issue of the MoVES newsletter. MoVES stands for “Modelling, Verification and Evolution of Software” and addresses these fundamental issues in software engineering. The project is sponsored by the Belgian government (belspo IAP programme). Each issue of the newsletter presents a partner and a work package. This issue presents results and ongoing research ofWork Pa...
متن کاملAn optimal model for Project Risk Response Portfolio Selection (P2RPS) (Case study: Research institute of petroleum industry)
In the real world, risk and uncertainty are two natural properties in the implementation of Mega projects. Most projects fail to achieve the pre-determined objectives due to uncertainty. A linear integer programming optimization model was used in this work to solve a problem in order to choose the most appropriate risk responses for the project risks. A mathematical model, in which work structu...
متن کاملDeveloping a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System
Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...