Critical Chain Project Scheduling: Utilizing Uncertainty for Buffer Sizing

نویسندگان

  • Mohammad Fallah
  • Behzad Ashtiani
چکیده

In this paper, we introduce a method for buffer sizing in Critical Chain project scheduling. Proposed approach considers lognormal distribution for modeling activities’ execution time. The inherent uncertainty of activities considered as a main factor to size the buffer in proposed method. For comparing with traditional methods we used problems presented in literature. The results depict that proposed method outperforms critical chain buffer sizing method.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

South African Journal of Industrial Engineering May 2008 Vol 19(1): 73-88 BUFFER SIZING FOR THE CRITICAL CHAIN PROJECT MANAGEMENT METHOD

Methods for sizing project and feeding buffers for critical chain project management are investigated. Experiments indicate that – in the absence of bias, and for certain classes of bias – buffer consumption is independent of the mean duration of a chain. Generally the popular method – a buffer size equal to 50% of the longest path leading to it – gives rise to excessively large buffers. Buffer...

متن کامل

Optimization of Time, Cost, and Quality in Critical Chain Method Using Simulated Annealing (RESEARCH NOTE)

In the last decade, theory of constraint application in project management lead to make a new approach for project scheduling and control as a critical chain. In this paper, a multi-objective optimization model for multi-project scheduling on critical chain is investigated. The objectives include time, cost and quality. In order to solve the problem, a Simulated Annealing algorithm is developed...

متن کامل

Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition

In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...

متن کامل

Fuzzy Scheduling of Repetitive Construction Projects

Uncertainty is an inherent characteristic of construction projects. Neglecting uncertainties associated with different input parameters in the planning stage could well lead to misleading and/or unachievable project schedules. The objective of this paper is to present a new approach towards scheduling repetitive construction projects while accounting for uncertainty. The paper presents an algor...

متن کامل

Abstract Number:008-0056 Abstract Title:An investigation of time buffer into the fundamentals of critical chain project management: A behavioral perspective

Number:008-0056 Abstract Title:An investigation of time buffer into the fundamentals of critical chain project management: A behavioral perspectiveTitle:An investigation of time buffer into the fundamentals of critical chain project management: A behavioral perspective Authors information : Name: Min Zhang Organization: Huazhong University of Science and Technology Address: Huazhong University ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010