A comprehensive study of Scheduling for cellular manufacturing system using Tabu Search Method
نویسندگان
چکیده
The main contribution of this work is to apply tabu search based algorithms for solution of scheduling of jobs in CMS environment. An attempt has been made in this work to vary the job sequencing so that optimal sequencing of jobs can be achieved. The idea behind this work is to perturb sequences in the search of better results. More the number of sequences higher will be the degree of the optimization of objective (COF). This algorithm is suitable to explore number of job sequences from a fixed job sequence and its ability to come out from local optima. The main objective, which is the combination of maximizing the machine utilization by keeping penalty cost nil is achieved by this method. A scheduling procedure is developed for a specific FMS to maintain its flexibility and thereby the intended performance measures. The mechanism operates based on tabu search and optimizes two contradicting objectives simultaneously. The problem in this research is considered as each processing step of job has a processing time with specific operation. Set up times of machines and intercellular movement times can be considered while solving the scheduling problem in future.
منابع مشابه
Scheduling Flow Line Manufacturing Cell through Multi Objective Memetic Algorithm Plánovanie priebežnej výrobnej bunky s využitím multi-účelového algoritmu Memetic
In recent years Cellular Manufacturing has become an effective tool for improving productivity. Attainment of full benefits of Cellular Manufacturing depends firstly on the design of the machine cells and part families, secondly on the method of operations which takes full advantage of cell properties. Inappropriate methods of loading and scheduling can even lead to the failure of the Cellular ...
متن کاملA Tabu Search Method for a New Bi-Objective Open Shop Scheduling Problem by a Fuzzy Multi-Objective Decision Making Approach (RESEARCH NOTE)
This paper proposes a novel, bi-objective mixed-integer mathematical programming for an open shop scheduling problem (OSSP) that minimizes the mean tardiness and the mean completion time. To obtain the efficient (Pareto-optimal) solutions, a fuzzy multi-objective decision making (fuzzy MODM) approach is applied. By the use of this approach, the related auxiliary single objective formulation can...
متن کاملAn Improved Tabu Search Approach for Solving the Job Shop Scheduling Problem with Tooling Constraints
Flexible manufacturing systems (FMSs) are nowadays installed in the mechanical industry. In such systems. many different part types are produced simultaneously and it is necessary to take tooling constraints into account for finding an optimal schedule. A heuristic method is presented for solving the m-machine, n-job shop scheduling problem with tooling constraints. This method. named TOMATO, i...
متن کاملA Review on Scheduling for Cellular Manufacturing System Using Tabu Search Method
The main contribution of this work is to apply Tabu search based algorithms for solution of scheduling of jobs in CMS environment. An attempt has been made in this work to vary the job sequencing so that optimal sequencing of jobs can be achieved. The idea behind this work is to perturb sequences in the search of better results. More the number of sequences higher will be the degree of the opti...
متن کاملShop Scheduling Using Tabu Search and Simulation
An important goal in scheduling products through a manufacturing facility is to assure that the work is completed as close as possible to its due date. Work that is late creates downstream delays, while early completion can be detrimental if storage space is limited. This paper reports initial results in developing a scheduling procedure for an automated steel plate fabrication facility. The ap...