Resource-constraint Multi-project Scheduling with Priorities and Uncertain Activity Durations

نویسندگان

  • Zheng Zheng
  • Shumin Lin
  • Ze Guo
  • Yueni Zhu
چکیده

Resource-constraint multi-project scheduling is one of the most important topic in the field of project management. Most current works solve this problem based on an idea that multiple projects can be simply emerged into a super-project in a deterministic environment, regardless of the project priority and robustness of schedules. This paper discusses the RCMPSP with priority and formulates a discrete bi-objective decision model. A modified NSGA-II based algorithm is presented to solve the model. Furthermore, we design systematic experiments to investigate the interrelationship between robustness and its related project parameters, including order strength, resource constrainedness and uncertainty level. The results demonstrate the effectiveness of the solution algorithm and show that the three parameters indeed have evident impacts on the robustness and makespan of projects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS

In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...

متن کامل

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS II. SOUNDS OF SILENCE: A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA HARMONY SEARCH METAHEURISTIC

In this paper, we present a new idea for robust project scheduling combined with a cost-oriented uncertainty investigation. The result of the new approach is a makespan minimal robust proactive schedule, which is immune against the uncertainties in the activity durations and which can be evaluated from a cost-oriented point of view on the set of the uncertain-but-bounded duration and cost param...

متن کامل

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH

This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...

متن کامل

Precedence Constraint Posting for the RCPSP with Uncertain, Bounded Durations

The Resource Constrained Project Scheduling Problem is an important problem in project management, manufacturing and resource optimization. We focus on a variant of RCPSP with time lags and uncertain activity durations. We adopt a Precedence Constraint Posting approach and add precedence constraints to the original project graph so that all resource conflicts are solved and a consistent assignm...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Int. J. Computational Intelligence Systems

دوره 6  شماره 

صفحات  -

تاریخ انتشار 2013