MIP models for production lot sizing problems with distribution costs and cargo arrangement

نویسندگان

  • Flavio Molina
  • Reinaldo Morabito
  • Silvio A. de Araujo
چکیده

This study presents mixed integer programming (MIP) models for production lot-sizing problems with distribution costs using unit load devices such as pallets and containers. Problems that integrate production lot-sizing decisions and loading of the products in vehicles (bins) are also modelled, in which constraints such as weight limits, volume restrictions or the value of the cargo loaded in the bins are considered. In general, these problems involve a tradeoff between production, inventory and distribution costs. Lot-sizing decisions should take into account production capacity and product demand constraints. Distribution decisions are related to the loading and transport of products in unit load devices. The MIP models are solved by the branch-and-cut method of an optimization package and the results show that these approaches have the potential to address different practical situations.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Extended Model Formulation of the Proportional Lot-Sizing and Scheduling Problem with Lost Demand Costs

We consider mixed-integer linear programming (MIP) models of production planning problems known as the small bucket lot-sizing and scheduling problems. We present an application of a class of valid inequalities to the case with lost demand (stock-out) costs. Presented results of numerical experiments made for the the Proportional Lot-sizing and Scheduling Problem (PLSP) confirm benefits of such...

متن کامل

A New model for integrated lot sizing and scheduling in flexible job shop problem

In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and S...

متن کامل

Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line

This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...

متن کامل

MIP models and exact methods for the Discrete Lot-sizing and Scheduling Problem with sequence-dependent changeover costs and times

Lot-sizing is one of the many issues arising in the context of production planning. Its main objective is to determine the timing and level of production so as to reach the best possible trade-off between minimizing setup and inventory holding costs and satisfying customer demand. When a limited production capacity and a deterministic time-varying demand rate are assumed, lot-sizing leads to th...

متن کامل

Lot sizing with rework and different inspection costs

This paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. We have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. Further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • JORS

دوره 67  شماره 

صفحات  -

تاریخ انتشار 2016