A COMPARATIVE MODEL OF EVM AND PROJECT’S SCHEDULE RISK ANALYSIS USING MONTE CARLO SIMULATION

نویسندگان

  • Bahar Mojabi M.A. Graduated of IT Management, Science & Research Branch, Islamic Azad University, Tehran, Iran
  • Jamshid Nazemi Faculty Member of Engineering Department, Science & Research Branch, Islamic Azad University, Tehran, Iran
  • Reza Radfar Associated Prof. of Industrial Management, Science & Research Branch, Islamic Azad University, Tehran, Iran
چکیده مقاله:

The issue of successful project management and control is of vital importance in today’s world. Although the time and cost of any project is determined in advance, paying less attention to an appropriate control and revision will result in a small chance of reaching those goals. The earned value management method that shows deviation of projects schedules and costs is of the good method for this problem however, it does not consider risks and uncertainties. Risk is defined as uncertainty of projects from internal and external environment. Identification and analysis of these risks with an appropriate and effective method is important. As regards conditions that risk imposes on project, the project will be deviated through its life cycle and managers should try to reduce deviations using corrective actions. However risk analysis is widely used in projects today, but this risk analysis is highly futuristic. The purpose of this research is designing a comparative model of earned value management and project schedule risk analysis that uses best corrective actions to improve the condition of the project. In this paper, earned value management indicators are calculated and analyzed and project completion time and delay factors are obtained by using a real project data. Also the project completion time and delay are investigated using project risk analysis and estimating activities completion time by doing Monte Carlo simulations. Finally by comparison of these two methods, a solution is proposed to improve the project condition.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

a comparative model of evm and project’s schedule risk analysis using monte carlo simulation

the issue of successful project management and control is of vital importance in today’s world. although the time and cost of any project is determined in advance, paying less attention to an appropriate control and revision will result in a small chance of reaching those goals. the earned value management method that shows deviation of projects schedules and costs is of the good method for thi...

متن کامل

Monte Carlo Simulation for Schedule Risks

Research was undertaken to assist practitioners in undertaking Monte Carlo simulation of project schedules. A probabilistic model was developed to translate project characteristics into schedule risk boundaries. This model has been tested in several projects and performed very well. Lessons learned during the application of Monte Carlo simulation to a large project are discussed.

متن کامل

Risk Analysis and Monte Carlo Simulation

So you're new to the idea of risk analysis, and you've got a lot of questions. What is risk? What do we mean by a "model?" What exactly is Monte Carlo simulation? Is anyone in your industry using this technique? This article is a simple overview to help you to understand what risk analysis is and why Monte Carlo simulation has become an increasingly popular and necessary technique for business ...

متن کامل

a comparative pragmatic analysis of the speech act of “disagreement” across english and persian

the speech act of disagreement has been one of the speech acts that has received the least attention in the field of pragmatics. this study investigates the ways power relations, social distance, formality of the context, gender, and language proficiency (for efl learners) influence disagreement and politeness strategies. the participants of the study were 200 male and female native persian s...

15 صفحه اول

Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is descri...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 2  شماره 2

صفحات  219- 225

تاریخ انتشار 2013-06-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

کلمات کلیدی

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023