A fuzzy multi-objective model for a project management problem

نویسندگان

  • S.H Nasseri Department of Mathematical Sciences, Mazandaran University, Babolsar, Iran
  • S.M. Mirmohseni Mathematics and Information Science, Key Laboratory of Mathematics and Interdisciplinary Sciences of Guangdong Higher Education Institutes, Guangzhou University, China
چکیده مقاله:

In this research, the multi-objective project management decision problem with fuzzy goals and fuzzy constraints are considered. We constitute α-cut approach and two various fuzzy goal programming solution methods for solving the Multi-Objective Project Management (MOPM) decision problem under fuzzy environments. The Interactive fuzzy multi-objective linear programming (i-FMOLP) and Weighted Additive approaches are proposed for solving multi-objective PM decision problem where fuzzy information are demonstrated by using linear membership functions (LMF). The proposed approaches effort contemporarily to minimize the total project costs, total completion time and total crashing costs and the several constraints such as the time between events i and j, the crashing time for activity (i,j) and the total budget capital. The weight of criteria for each objective function base on project DM preference degree computed with Fuzzy AHP technique. The performance analysis calculated with a set of distance metric for i-FMOLP and Weighted Additive solution methods that represent uncertainty goals and constraints in PM decision problem with ideal solution in an industrial case study is compared.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving a bi-objective project capital budgeting problem using a fuzzy multi-dimensional knapsack

In this paper, the researchers have proposed a multi-dimensional knapsack model for project capital budgeting problem in uncertain situation which has been modeled through fuzzy sets. The optimistic and pessimistic situations were considered and associated deterministic models were yielded. Numerical example has been supplied toillustrate the performance of proposed model. The results were prom...

متن کامل

A multi-objective mathematical model for production-distribution scheduling problem

With increasing competition in the business world and the emergence and development of new technologies, many companies have turned to integrated production and distribution for timely production and delivery at the lowest cost of production and distribution and with the least delay in delivery. By increasing human population and the increase in greenhouse gas emissions and industrial waste, in...

متن کامل

A New Multi-Objective Model for Dynamic Cell Formation Problem with Fuzzy Parameters

This paper proposes a comprehensive, multi-objective, mixed-integer, nonlinear programming (MINLP) model for a cell formation problem (CFP) under fuzzy and dynamic conditions aiming at: (1) minimizing the total cost which consists of the costs of intercellular movements and subcontracting parts as well as the cost of purchasing, operation, maintenance and reconfiguration of machines, (2) maximi...

متن کامل

A Fuzzy Multi Objective Programming Model for Power Generation and Transmission Expansion Planning Problem

The increasing consumption of electricity over time forces different countries to establishnew power plants and transmission lines. There are various crisp single-objective mathematicalmodels in the literature for the long-term power generation and transmission expansion planning tohelp the decision makers to make more reasonable decisions. But, in practice, most of the parametersassociated wit...

متن کامل

A Fuzzy Multi-Objective Optimization Model for Production and Consumption Management in Energy Micro Smart Grids

Electricity is one of the most important carriers of energy used in buildings. By introducing energy smart grids (SG) and energy micro smart grids (MSGs) alongside smart buildings, a good platform has been provided for optimal planning of electricity production and consumption. In this paper, an MSG consists of renewable resources, diesel generators and cell batteries in bidirectional connectio...

متن کامل

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 09  شماره 2

صفحات  107- 117

تاریخ انتشار 2017-12-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023