A mathematical model for sustainable probabilistic network design problem with construction scheduling considering social and environmental issues

نویسندگان

  • Hamed Mogouie Department of Industrial and Systems Engineering, Isfahan University of Technology, Isfahan, Iran, 84156-83111
  • Reza Mahmoudi Department of Industrial and Systems Engineering Isfahan University of Technology 84156-83111 Isfahan, Iran
چکیده مقاله:

Recent facility location allocation problems are engaged with social, environmental and many other aspects, besides cost objectives.Obtaining a sustainable solution for such problems requires development of new mathematical modeling and optimization algorithms. In this paper, an uncapacitated dynamic facility location-network design problem with random budget constraints is considered. Social issues such as public satisfaction as a function of construction time, number of missed jobs incurred in the regions under study and environmental considerations are incorporated in the model.Sincethe proposed model is expected to be capable of dealing with probabilistic network design, a new chance constraint formulation is proposed and manipulated to increase the applicability of the model in uncertain decisions. Moreover, the proposed method enables decision makers to determine the completion rate of projects through a time horizon while this notion is not achievable by applying other methods in the literature. The optimization of the proposed model is performed using anovel bi-section procedure in which a heuristic and a Simulated Annealing (SA) method are applied interactively. The efficiency of the proposed method is verified through a real world application of establishing a set of health care centers and the connecting links in MeshginShahr,Iran. The results of case study showed that all considered sustainable objectives come to a steady status in the fifth year. Also according to geographical data, the results about creating links are regional and the health centers have dispersed geographically in order to serve the demands of the whole under study region.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A new multi-objective mathematical model for hazardous waste management considering social and environmental issues

Hazardous waste management incorporates collection, separation, treatment, recycling and disposal of hazardous wastes. In this paper, a new multi-objective mixed integer model is presented for hazardous waste collection problem. The model aims to minimize transportation and construction costs, and environmental and population risks in hazardous waste management systems. This model is applied in...

متن کامل

A mathematical model for vehicle routing and scheduling problem with cross-docking by considering risk

Today, many companies after achieving improvements in manufacturing operations are focused on the improvement of distribution systems and have long been a strong tendency to optimize the distribution network in order to reduce logistics costs that the debate has become challenging. Improve the flow of materials, an activity considered essential to increase customer satisfaction. In this study, ...

متن کامل

A multi-objective mathematical model for production-distribution scheduling problem

With increasing competition in the business world and the emergence and development of new technologies, many companies have turned to integrated production and distribution for timely production and delivery at the lowest cost of production and distribution and with the least delay in delivery. By increasing human population and the increase in greenhouse gas emissions and industrial waste, in...

متن کامل

Considering Pricing Problem in a Dynamic and Integrated Design of Sustainable Closed-loop Supply Chain Network

Flexible and dynamic supply chain network design problem has been studied by many researchers during past years. Since integration of short-term and long-term decisions in strategic planning leads to more reliable plans, in this paper a multi-objective model for a sustainable closed-loop supply chain network design problem is proposed. The planning horizon of this model contains multiple strate...

متن کامل

A Mathematical Model for Sustainable and Resilient Supply Chain by Considering Synchronization in the Production and Distribution Network

Nowadays, supply chain management (SCM) is an interesting problem that has attracted the attention of many researchers. Transportation network design is one of the most important fields of SCM. In this paper, a logistics network design is considered to optimize the total cost and increase the network stability and resiliency. First, a mixed integer nonlinear programming model (MINLP) is formula...

متن کامل

A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times

This paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. In the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). However,, two significant criteria for each schedule in stochastic models are: expectable m...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 10  شماره special issue on scheduling

صفحات  17- 37

تاریخ انتشار 2017-11-09

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023