A Multi-Objective Particle Swarm Optimization Algorithm for a Possibilistic Open Shop Problem to Minimize Weighted Mean Tardiness and Weighted Mean Completion Times

نویسندگان

  • Javadian
  • Noori Darvish
  • Tavakkoli-Moghaddam
چکیده مقاله:

We consider an open shop scheduling problem. At first, a bi-objective possibilistic mixed-integer programming formulation is developed. The inherent uncertainty in processing times and due dates as fuzzy parameters, machine-dependent setup times and removal times are the special features of this model. The considered bi-objectives are to minimize the weighted mean tardiness and weighted mean completion times. After converting the original formulation into a single-objective crisp one by using an interactive approach and obtaining the Pareto-optimal solutions for small-sized instances, an efficient multi-objective particle swarm optimization (MOPSO) is proposed in order to achieve a good approximate Pareto-optimal set for medium and large-sized examples. This algorithm exploits new selection regimes of the literature for the global best and personal best. Furthermore, a modified decoding scheme is designed to reduce the search area in the solution space, and a local search algorithm is proposed to generate initial particle positions. Finally, the efficiency of the proposed MOPSO (PMOPSO) is shown by comparing with the common MOPSO (CMOPSO) by the use of the design of experiments (DOE) based on three comparison metrics.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness

This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...

متن کامل

Single machine scheduling problem with interval processing times to minimize mean weighted completion time

The single resource scheduling problem is commonly applicable in practice not only when there is a single resource but also in some multiple-resource production systems where only one of the resources is bottle neck. Thus, the single resource (machine) scheduling problem has been widely addressed in the scheduling literature. In this paper, the single machine scheduling problem with uncertain a...

متن کامل

An Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time

This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other exist...

متن کامل

Minimizing weighted mean absolute deviation of job completion times from their weighted mean

We address a single-machine scheduling problem where the objective is to minimize the weighted mean absolute deviation of job completion times from their weighted mean. This problem and its precursors aim to achieve the maximum admissible level of service equity. It has been shown earlier that the unweighted version of this problem is NP-hard in the ordinary sense. For that version, a pseudo-po...

متن کامل

Fuzzy Particle Swarm Optimization Algorithm for a Supplier Clustering Problem

This paper presents a fuzzy decision-making approach to deal with a clustering supplier problem in a supply chain system. During recent years, determining suitable suppliers in the supply chain has become a key strategic consideration. However, the nature of these decisions is usually complex and unstructured. In general, many quantitative and qualitative factors, such as quality, price, and fl...

متن کامل

Multi-objective Geometric Programming Problem With Weighted Mean Method

Geometric programming is an important class of optimization problems that enable practitioners to model a large variety of real-world applications, mostly in the field of engineering design. In many real life optimization problem multi-objective programming plays a vital role in socio economical and industrial optimizing problems. In this paper we have discussed the basic concepts and principle...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 3  شماره None

صفحات  61- 88

تاریخ انتشار 2012-04

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

کلمات کلیدی

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023