A Two-Phase Simulation-Based Optimization of Hauling System in Open-Pit Mine

نویسندگان

  • Armin Ghane Kanafi Department of Mathematics, Lahijan Branch, Islamic Azad University, Lahijan, Iran
  • Maryam Daneshmandmehr Department of Industrial Engineering, Lahijan Branch, Islamic Azad University, Lahijan, Iran
  • Milad Abolghasemian Department of Industrial Engineering, Lahijan Branch, Islamic Azad University, Lahijan, Iran
چکیده مقاله:

One of the key issues in mining is the hauling system. Truck and shovels are the most widely used transportation equipment in mines. In this paper, a two-phase simulation-based optimization is presented to maximize utilization of hauling system in the largest Iranian open-pit copper mine. In the first phase, The OptQuest for Arena software package was used to solve the optimization problem to provide an optimal production quantity. In the second phase, the haulage system problem in the open-pit was modeled by bi-objective optimization programing by means of meta-modeling approach. Meta-modeling approach could estimate the exact total production quantities, and solved the problem by determining the optimal value of shovels using the design of experiments. The efficient solution of the bi-objective problem was obtained using -constraint method. The results of the proposed approach were compared with the current situation, where the total production had increased by 21% (equivalent to 10K tons) through the proposed approach. Therefore, calculations in this mine show that how the proposed framework can improve the production and productivity of haulage system.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

synthesis of platinum nanostructures in two phase system

چکیده پلاتین، فلزی نجیب، پایدار و گران قیمت با خاصیت کاتالیزوری زیاد است که کاربرد های صنعتی فراوانی دارد. کمپلکس های پلاتین(ii) به عنوان دارو های ضد سرطان شناخته شدند و در شیمی درمانی بیماران سرطانی کاربرد دارند. خاصیت کاتالیزوری و عملکرد گزینشی پلاتین مستقیماً به اندازه و- شکل ماده ی پلاتینی بستگی دارد. بعضی از نانو ذرات فلزی در سطح مشترک مایع- مایع سنتز شده اند، اما نانو ساختار های پلاتین ب...

A genetic algorithm approach for open-pit mine production scheduling

In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...

متن کامل

Analyzing the effect of ore grade uncertainty in open pit mine planning; A case study of Rezvan iron mine, Iran

Due to uncertain nature of grade in ore deposits, considering uncertainty is inevitable in geological modelling of resources and mine planning. In other words, uncertainty in grade of mineralized materials, is one of the most significant parameters need attention in mine planning. In this paper, a comparative procedure utilizing Sequential Gaussian Simulation (SGS) and traditional Ordinary Krig...

متن کامل

A New Cost Model for Estimation of Open Pit Copper Mine Capital Expenditure

One of the most important issues in all stages of mining study is capital cost estimation. Determination of capital expenditure is a challenging issue for mine designers. In recent decade, quite a few number of studies have focused on proposing estimation models to predict mining capital cost. However, these efforts have not achieved to a predictor model with reliable range of error. Both of ov...

متن کامل

Swarm –Based Truck-Shovel Dispatching System in Open Pit Mine Operations

The dispatch of trucks and shovel has always been an important component in the success of open pit mine operations. Dispatch systems have evolved from manual to today automatic with almost no human intervention. Although dispatching systems available today are “pseudo real time” and efficient, the optimal dispatching is realized over subsets of the fleet when dealing with large fleets. This ap...

متن کامل

Open pit limit optimization using dijkstra’s algorithm

In open-pit mine planning, the design of the most profitable ultimate pit limit is a prerequisite to developing a feasible mining sequence. Currently, the design of an ultimate pit is achieved through a computer program in most mining companies. The extraction of minerals in open mining methods needs a lot of capital investment, which may take several decades. Before the extraction, the p...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 13  شماره 4

صفحات  705- 732

تاریخ انتشار 2020-10-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023